The Cooling and Ventilation Group has started the LHC construction work in September 1999 and will get into full activity when LEP will be stopped and dismantled: in total 12 major contracts for an amount of about 120 MCHF will be established to build the needed installations for the LHC. The author will report on the current works that are in progress on the different LEP Points distinguishing between the Ventilation and the Water Cooling installations. The Ventilation work, completed in the new surface buildings in Points 18, is currently held in Points 4 and 5. Point 1 will follow in the near future. The work for the Cooling plants comprehend the pumping stations, the cooling towers and the chilled water production stations in Points 1 and 5, the buried pipes in Points 1 and 4. For all of these activities, an updated report of the progress of the work, of the planning and of the expenses is given. Finally, a short overview of the future activities is presented