In this note a muon front-end without cooling is presented. The muons are captured, ro-tated and accelerated to the energy needed for injection into the first muon recirculator. The cavity parameters are consistent with those used for the CERN reference scenario [1]. The number of muons obtained per year is roughly one order of magnitude less than the one obtained with the cooling channel. Therefore such a scheme could be a first step to a neutrino factory keeping the option of later upgrade