research

Thermal transient analysis of TI8 tunnel

Abstract

The TI8 tunnel will house a proton beam transfer line of 450 GeV from the SPS to the LHC collider. This line will comprise 340 classical compact design magnets which are expected to dissipate about 120 W/m to the air along the tunnel. As the ventilation injection and extraction points are separated by approximately 2.5 Km (the length of the tunnel), a significant increase in the air bulk temperature is expected along the distance. This report presents an estimation of the air temperature evolution with time at the end of the tunnel

    Similar works