research

The Central Beam and Cycle Management of the CERN Accelerator Complex

Abstract

The efficient exploitation of the CERN accelerator complex in the future, with new cycles to fill the LHC and possibly a dedicated neutrino cycle in addition to the actual fixed-target program, will require a rapid and coordinated response to adapt to the changing user requests. This paper reviews the general sequencing problem and describes some preliminary concepts and algorithms suitable for managing a network of accelerators. The benefits derived from the architecture that has already been implemented in the PS complex, since its start up in March, are presented. The last accelerator in the injector chain, the SPS, is currently running fixed super-cycles. Its event-based timing system will be integrated into the central control by the year 2001 in a way that is transparent to the SPS equipment

    Similar works