research

Operation of LEP with bunch trains

Abstract

Following an intensive MD program in 1994, a bunch train scheme was adopted as the operational mode for LEP. The configuration was used throughout 1995 and produced record luminosities. The year culminated in a high energy bunch train run which produced encouraging results for LEP2. In spite of this, the bunch train scheme met with varying degrees of success and the overall performance was not as good as expected. The performance of the machine is presented, together with the problems encountered and the various optimisation techniques used. The performance of related hardware and instrumentation is discussed

    Similar works