Abstract

The general scheme for the fast, pipelined first level trigger on high pt muons in the CMS detector at LHC is presented. The prototype PACT system was tested in the high momentum muon beams in the RD5 experiment during 1993/94 runs. The obtained efficiency curves are shown

    Similar works