Arrival of the cold box for the cryogenic refrigeration plant and installation in building SHL5.

Abstract

The pictures show the arrival of the cold box and the installation of both the cold box and the valve panel in building SHL5. The installation was achieved by lowering the components through an opening in the roof which had been specially forseen for this operation

    Similar works

    Full text

    thumbnail-image

    Available Versions