research

Joint Estimation of the Time Delay and the Clock Drift and Offset Using UWB signals

Abstract

We consider two transceivers, the first with perfect clock and the second with imperfect clock. We investigate the joint estimation of the delay between the transceivers and the offset and the drift of the imperfect clock. We propose a protocol for the synchronization of the clocks. We derive some empirical estimators for the delay, the offset and the drift, and compute the Cramer-Rao lower bounds and the joint maximum likelihood estimator of the delay and the drift. We study the impact of the protocol parameters and the time-of-arrival estimation variance on the achieved performances. We validate some theoretical results by simulation.Comment: Accepted and published in the IEEE ICC 2014 conferenc

    Similar works

    Full text

    thumbnail-image

    Available Versions