Abstract

A Compact Transverse Deflecting System (Compact-TDS) designed for longitudinal electron bunch diagnostics in the femtosecond regime is presently undergoing commissioning at the Karlsruhe Institute of Technology (KIT). This technique, based on THz streaking using a resonator structure, demands a high level of electron beam controllability and stability at the micrometer scale. To meet these requirements, the linear accelerator FLUTE (Ferninfrarot Linac- Und Test-Experiment) has undergone major upgrades in 2023, incorporating a new RF system equipped with a klystron, RF photoinjector and solenoid magnet. In this contribution, we present first experiments conducted with the Compact-TDS at FLUTE, utilizing the upgraded RF setup

    Similar works