RELAP/FRAP-T6 analysis of seized and sheared shaft accidents. [PWR]

Abstract

Argonne National Laboratory (ANL) performed audit calculations of a Reactor Coolant Pump (RCP) seized/sheared shaft transient for the Westinghouse Seabrook Plant using RELAP5/MOD 1.5 (Cycle 32) and FRAP-T6. The objective was to determine the effect of time of loss of offsite power and other single component failures on the peak clad temperature. The RCP shaft seizure event was modeled in RELAP5 by using the pump model shaft stop option. In modeling the sheared shaft failure, the faulted pump was replaced with a branch component having no flow losses. In general, the RELAP5-predicted system response for the seized shaft transient was very comparable to the results presented in the Seabrook FSAR, although the Reactor Coolant System (RCS) pressure response was somewhat different. The RELAP5 sheared-shaft analysis results were very similar to those for the seized shaft