Analysis of a SBLOCA initiated by an ATWS event

Abstract

The response of a four-loop Westinghouse pressurized water reactor to SBLOCAs initiated as a result of an anticipated transient without scram (ATWS) has been analyzed using the RELAP5 computer code. The ATWS is initiated by a loss-of-feedwater, and the small breaks were due to either one or three stuck-open safety valves or reactor coolant pump seal failure. For the cases analyzed, the results show that a LOF-ATWS followed by a SBLOCA does not have more safety significance than that found when each accident is analyzed independently of one another

    Similar works