Sizing and control of a Hybrid hydro-battery-flywheel storage system for frequency regulation services

Abstract

Energy security and environmental challenges are some of the drivers for increasing the electricity generation from non-programmable Renewable Energy Source (RES), adding pressure to the grid, especially if located in weakly connected (or isolated) islands, like Sardinia. Variable-speed Pumped Storage Hydro Power (PSHP) can offer a high degree of flex ibility in providing ancillary services (namely primary and secondary regulations), but due to the hydromechanical nature of the equipment, sudden variations in the power output cause wear and tear. Other energy storage devices can not compete with PSHP in terms of energy and power availability. This work aims to assess the potential benefits derived from the hybridization of a PSHP with Battery Energy Storage System (BESS) and Flywheel Energy Storage System (FESS) in providing frequency regulation services to the grid of the Sardinia Island (Italy). The focus of the study tries to cross both the plant owner point of view, whose aim is to have a smooth PSHP operation and the economic incentive to hybridize the plant, and the Transmission System Operator’s, whose aim is to have a fast reacting plant that better stabilizes the grid frequency. This is done by simulations of a detailed dynamic model of the PSHP, whose hydraulic machine has been characterized from real experimental data, the BESS and the FESS. Moreover, two power management strategies are presented, based on different criteria, to effectively coordinate the devices making up the Hybrid Energy Storage System (HESS). First the simulations are performed open-loop, to assess the impact of various combinations of installed BESS and FESS powers over the wear and tear of the equipment. Later the model is used in an optimization procedure to find the combination of installed BESS and FESS powers and the respective controlparameters that would guarantee the maximum economic return at the end of the investment life. Last, the model is included into a Sardinian power system model and simulated in a future scenario with high RES penetration, assessing the plant capabilities to effectively contain and restore the frequency. Results show that there is not a catch-all solution in terms of hybridization and that a trade-off must be made between the plant owner’s urge to smoothly operate the plant in order to reduce the equipment degradation, and the TSO’s objective to have fast responsive plants providing high quality frequency regulation services. If on one hand open-loop simulations show that the hybridization reduce the main wear and tear indicators, on the other the optimal hybrid system limits the plant ability to contain the frequency excursions in closed-loop simulations, as the optimization problem was formulated over the plant owner’s interests. The results show that there much potential for frequency stabilization and wear and tear reduction, but more techno-economic data is required to fully investigate the benefits of this configuration.Energy security and environmental challenges are some of the drivers for increasing the electricity generation from non-programmable Renewable Energy Source (RES), adding pressure to the grid, especially if located in weakly connected (or isolated) islands, like Sardinia. Variable-speed Pumped Storage Hydro Power (PSHP) can offer a high degree of flex ibility in providing ancillary services (namely primary and secondary regulations), but due to the hydromechanical nature of the equipment, sudden variations in the power output cause wear and tear. Other energy storage devices can not compete with PSHP in terms of energy and power availability. This work aims to assess the potential benefits derived from the hybridization of a PSHP with Battery Energy Storage System (BESS) and Flywheel Energy Storage System (FESS) in providing frequency regulation services to the grid of the Sardinia Island (Italy). The focus of the study tries to cross both the plant owner point of view, whose aim is to have a smooth PSHP operation and the economic incentive to hybridize the plant, and the Transmission System Operator’s, whose aim is to have a fast reacting plant that better stabilizes the grid frequency. This is done by simulations of a detailed dynamic model of the PSHP, whose hydraulic machine has been characterized from real experimental data, the BESS and the FESS. Moreover, two power management strategies are presented, based on different criteria, to effectively coordinate the devices making up the Hybrid Energy Storage System (HESS). First the simulations are performed open-loop, to assess the impact of various combinations of installed BESS and FESS powers over the wear and tear of the equipment. Later the model is used in an optimization procedure to find the combination of installed BESS and FESS powers and the respective controlparameters that would guarantee the maximum economic return at the end of the investment life. Last, the model is included into a Sardinian power system model and simulated in a future scenario with high RES penetration, assessing the plant capabilities to effectively contain and restore the frequency. Results show that there is not a catch-all solution in terms of hybridization and that a trade-off must be made between the plant owner’s urge to smoothly operate the plant in order to reduce the equipment degradation, and the TSO’s objective to have fast responsive plants providing high quality frequency regulation services. If on one hand open-loop simulations show that the hybridization reduce the main wear and tear indicators, on the other the optimal hybrid system limits the plant ability to contain the frequency excursions in closed-loop simulations, as the optimization problem was formulated over the plant owner’s interests. The results show that there much potential for frequency stabilization and wear and tear reduction, but more techno-economic data is required to fully investigate the benefits of this configuration

    Similar works