The first part of the presentation will summarize the overall cryogenic
performance and availability for 2017 and the expected performance for 2018
taking into account the beam induced heat loads in the inner triplets magnets
and the beam screen circuits. The second part will focus on the update of the
expected cryogenic limitations as well as on the available cryogenic power
studies and associated tuning in order to deliver the required cooling power
with respect to the 2018 beams operational conditions. The feedforward controls
and refrigeration capacity improvements on the inner triplets and beam screen
circuits will be discussed