Lowering of the cryogenic transfer line segments to USC55.

Abstract

The pictures show the transfer of the helium transfer line segments to the USC55 cavern. The transport of the just under 12m long segments has been achieved by the means of a tilting table

    Similar works

    Full text

    thumbnail-image

    Available Versions