research

Electrical Network Supervisor Status Report

Abstract

During year 2000 CERN has installed the Electrical Network Supervisor (ENS) for the monitoring and control of the equipment of the electrical distribution network located in about 100 substations throughout the different sites. In the first phase the system has been installed in parallel with the original CERN-developed system and databases and mimic diagrams have been prepared to cover parts of the distribution network. The system has been integrated with the general ST supervision systems for alarms monitoring and measurement logging, and the data from the ENS are gradually being integrated. In the second phase an extension of the system has been tested to include a direct industrial interface with the electrical equipment without the need for the existing CERN equipment interfaces. During the 2000-2001 shutdown the supervision will be renovated in a number of zones to operate a complete industrial system covering all aspects of the supervision from equipment interfaces to end-user applications

    Similar works