research

Performance Report and Improvements in CV Machine Areas

Abstract

The performance of cooling and ventilation (CV) equipment is defined as its availability to the PS, SPS and LEP accelerators. Three teams for the accelerators plus a Utilities team, which receives performance information from the physics and technical control room, carry out the operation of this equipment. Collected performance statistics as well as data from the Computer Aided Maintenance Management system (CAMM) and supervision system provide information on the exact state of the CV equipment. This is used to more effectively schedule preventive maintenance which, by reducing system failures, results in improved equipment performance. This paper will present performance data and discuss the prospects for improving it through the use of an updated version of CAMM and a new supervision system

    Similar works