Evaluation of Wind Turbine Operation Status Based on ACO + FAHP

Abstract

Aiming at the shortcomings of the fuzzy analytic hierarchy process (FAHP) in the comprehensive evaluation of wind power projects, such as the diffi culty of satisfying and modifying the consistency of the judgment matrix and the high computational complexity, a fuzzy analytic hierarchy process based on ant colony optimization (ACO+FAHP) is proposed. Firstly, the proposed fuzzy analytic hierarchy process based on ant colony optimization algorithm overcomes the disadvantages that the weight and consistency cannot be improved once the judgment matrix is given. The comparison chart of the consistency ratio calculated according to this method shows that the consistency ratio B, C1-C5 all have diff erent degrees of reduction. Then, in view of the fact that various qualitative indicators cannot be accurately calculated, the wind turbine operating status evaluation model is established by using the fuzzy comprehensive evaluation method. In this paper, the evaluation score of a certain wind farm is 0.731, which means that the operators need to carry out high-level maintenance at this time

    Similar works