Nowoczesne technologie odbudowy filara bezpieczeństwa w kopalniach

Abstract

Safety pillars are made around mines as a protection measure. This is especially important in salt mines where the surrounding waters are most hazardous. Without maintaining safe conditions the mine may be water-flooded as it was the case in one of the Polish mine “Wapno“. An original technology linking pipeline injection and hole injection methods has been used for the reconstruction of a safety pillar in the Salt Mine “Wieliczka“. This solution turned out to be successful when on 13 April 1992 the mine was saved from flooding after a disastrous water flux to the transverse working Mina. The presented technology can be efficiently used in various mines at the stage of designing, though their exploitation to the closing stage.Dla zapewnienia bezpieczeństwa wokół każdej kopalni należy utworzyć filar ochronny. Szczególnie jest to istotne w kopalniach soli, dla których otaczająca je woda jest największym zagrożeniem. Nie zachowanie odpowiednich warunków może się skończyć nawet zatopieniem kopalni, co miało miejsce nawet w Polsce - Kopalnia „Wapno”. W pracy opisano oryginalną technologię iniekcji rurociągowej połączoną z iniekcją otworową zastosowaną do odbudowy filara ochronnego w Kopalni Soli „Wieliczka”, która pozwoliła ją uratować przed zatopieniem po katastrofalnym dopływie wody, który wystąpił 13 kwietnia 1992 roku w poprzeczni Mina. Przedstawiona technologia może być z powodzeniem zastosowana w różnych kopalniach i to na etapie od ich budowy, poprzez czas eksploatacji aż na etapie likwidacji kończąc

    Similar works