Thomas Jefferson National Accelerator Facility (U.S.)
Abstract
KEK and Jlab have continued S0-study collaboration on ICHIRO 9-cell cavities since 2008. In 2010, we have started S0 study on ICHIRO#7, full 9-cell cavity with end groups. Surface treatments and vertical tests have been repeated at Jlab. Maximum gradient of 40MV/m was achieved so far. We will describe the details of that and further plan of S0-study on ICHIRO 9-cell