Major repository design issues

Abstract

The Yucca Mountain Project is focused on producing a four-part viability assessment in late FY98. Its four components (design, performance assessment, cost estimate, and licensing development plan) must be consistent. As a tool to clarify design issues and compare design and performance assessment options, a series of repository sketches were developed for the sequential time phases of a repository. The boundaries of the time phases correspond to evolution In the engineered barrier system (EBS)