Parameterized Complexity of a Parallel Machine Scheduling Problem

Abstract

In this paper we consider the parameterized complexity of two versions of a parallel machine scheduling problem with precedence delays, unit processing times and time windows. In the first version - with exact delays - we assume that the delay between two jobs must be exactly respected, whereas in the second version - with minimum delays - the delay between two jobs is a lower bound on the time between them. Two parameters are considered for this analysis: the pathwidth of the interval graph induced by the time windows and the maximum precedence delay value. We prove that our problems are para-NP-complete with respect to any of the two parameters and fixed-parameter tractable parameterized by the pair of parameters

    Similar works