Post Processing Mount

Abstract

Producing a modular post-processing workbench for the deburring technicians at Mitsubishi Power Systems in Savannah, GA. The mount must hold a minimum of 8,500 lbs. during stationary and modular movement without endangering the health/safety of the technicians or the working part. A scaled down prototype for the workbench must be presented by the end of the semester as a required deliverable

    Similar works