Magazine Article by J.S. Seybold Regarding the Construction of the Garrison Dam, October, 1949

Abstract

This reprint of an article in Civil Engineering, The Magazine of Engineered Construction, dated October, 1949, by Colonel of the United States Corps of Engineers J.S. Seybold is a publication of the North Dakota State Water Conservation Commission. The six page article provides pictures and diagrams outlining the progress of the Garrison Dam project and is divided by the following subtopics: Seepage Control and Drainage, Driving Cutoff Piling, Eight Tunnels in Right Abutment, Test Tunnel on Site of Penstock No. 4, Measurements Provide Design Data, Intake Structure Contract Let, Spillway in Left Abutment, Permanent Town Built, Progress to Date. The article is marked with the handwritten annotation “Garrison Dam.” No day is given for the publication.https://commons.und.edu/burdick-papers/1491/thumbnail.jp

    Similar works