CORE
🇺🇦
make metadata, not war
Services
Services overview
Explore all CORE services
Access to raw data
API
Dataset
FastSync
Content discovery
Recommender
Discovery
OAI identifiers
OAI Resolver
Managing content
Dashboard
Bespoke contracts
Consultancy services
Support us
Support us
Membership
Sponsorship
Community governance
Advisory Board
Board of supporters
Research network
About
About us
Our mission
Team
Blog
FAQs
Contact us
Early Warning Signals of Failures in Building Management Systems
Authors
VN Livina
J Mesa-Jimenez
L Stokes
Q Yang
Publication date
26 May 2021
Publisher
'EDP Sciences'
Doi
Abstract
Copyright © J.J. Mesa-Jiménez et al. In the context of sensor data generated by Building Management Systems (BMS), early warning signals are still an unexplored topic. The early detection of anomalies can help preventing malfunctions of key parts of a heating, cooling and air conditioning (HVAC) system that may lead to a range of BMS problems, from important energy waste to fatal errors in the worst case. We analyse early warning signals in BMS sensor data for early failure detection. In this paper, the studied failure is a malfunction of one specific Air Handling Unit (AHU) control system that causes temperature spikes of up to 30 degrees Celsius due to overreaction of the heating and cooling valves in response to an anomalous temperature change caused by the pre-heat coil in winter period in a specific area of a manufacturing facility. For such purpose, variance, lag-1 autocorrelation function (ACF1), power spectrum (PS) and variational autoencoder (VAE) techniques are applied to both univariate and multivariate scenarios. The univariate scenario considers the application of these techniques to the control variable only (the one that displays the failure), whereas the multivariate analysis considers the variables affecting the control variable for the same purpose. Results show that anomalies can be detected up to 32 hours prior to failure, which gives sufficient time to BMS engineers to prevent a failure and therefore, an proactive approach to BMS failures is adopted instead of a reactive one.EPSRC DTP PhD Studentship, NPL and Mitie
Similar works
Full text
Available Versions
Sustaining member
Brunel University Research Archive
See this paper in CORE
Go to the repository landing page
Download from data provider
oai:bura.brunel.ac.uk:2438/226...
Last time updated on 16/05/2021
EDP Sciences OAI-PMH repository (1.2.0)
See this paper in CORE
Go to the repository landing page
Download from data provider
oai:edpsciences.org:dkey/10.10...
Last time updated on 25/06/2021