In the National Spallation Neutron Source (NSNS) design, a 180 meter long
transport line connects the 1 GeV linac to an accumulator ring. The linac beam
has a current of 28 mA, pulse length of 1 ms, and 60 Hz rep rate. The high
energy transport line consists of sixteen 60 degrees FODO cells, and
accommodates a 90 degrees achromatic bend, an energy compressor, collimators,
part of injection system, and enough diagnostic devices to measure the beam
quality before injection. To reduce the uncontrolled beam losses, this line has
nine beam halo scrapers and very tight tolerances on both transverse and
longitudinal beam dynamics under space charge conditions. The design of this
line is presented.Comment: 3 pages, transfer line desig