At the beginning of the design and construction of the STAR Detector, the
collaboration assigned a team of physicists and engineers the responsibility of
coordinating the construction of the detector. This group managed the general
space assignments for each sub-system and coordinated the assembly and planning
for the detector. Furthermore, as this group was the only STAR group with the
responsibility of looking at the system as a whole, the collaboration assigned
it several tasks that spanned the different sub-detectors. These items included
grounding, rack layout, cable distribution, electrical, power and water, and
safety systems. This paper describes these systems and their performance.Comment: 17 pages, 6 figures, Contribution to a NIM Volume Dedicated to the
Detectors and the Accelerator at RHI