Early stage cost estimation of buildings construction projects using artificial neural networks

Abstract

A ISTRA ("|" Early stage cost estimate plays a significant role in any initial construction project decisions, despite the project scope has not yet been finalized and still very limited information regarding the detailed design is available during these early stages. This study aimed at developing an efficient model to estimate the cost of building construction projects at early stages using artificial neural networks. A database of 71 building projects is collected from the construction industry of the Gaza Strip. Several significant parameters were identified for the structural skeleton cost of the project and yet can be obtained from available engineering drawings and data at the pre-design stage of the project. The input layer of the Artificial Neural Networks (ANN) model comprised seven parameters, namely: ground floor area, typical floor area, number of storeys, number of columns, type of footing, number of elevators and

    Similar works