STATUS OF THE SIAM PHOTON LABORATORY

Abstract

Abstract The Present status of the Siam Photon Laboratory is reported. The assembly of the accelerator complex with a 1 GeV storage ring has been completed. The commissioning of the accelerator complex has just started. However, there remain some problems to be solved. The work of conceptual design and the determination of the specifications of the undulator to be installed in the storage ring have been completed. The installation of the first two beam lines has started already. Other items such as the infrastructure reformation, the organization development, and the human resources development are also described