338,553 research outputs found

    A Market-based Approach to Multi-factory Scheduling

    No full text
    In this paper, we report on the design of a novel market-based approach for decentralised scheduling across multiple factories. Specifically, because of the limitations of scheduling in a centralised manner -- which requires a center to have complete and perfect information for optimality and the truthful revelation of potentially commercially private preferences to that center -- we advocate an informationally decentralised approach that is both agile and dynamic. In particular, this work adopts a market-based approach for decentralised scheduling by considering the different stakeholders representing different factories as self-interested, profit-motivated economic agents that trade resources for the scheduling of jobs. The overall schedule of these jobs is then an emergent behaviour of the strategic interaction of these trading agents bidding for resources in a market based on limited information and their own preferences. Using a simple (zero-intelligence) bidding strategy, we empirically demonstrate that our market-based approach achieves a lower bound efficiency of 84%. This represents a trade-off between a reasonable level of efficiency (compared to a centralised approach) and the desirable benefits of a decentralised solution

    Heuristic branch-and-price for building long term trainee schedules.

    Get PDF
    Branch-and-price is an increasingly important technique for solving large integer programming models. Staff scheduling has been a particularly fruitful area since these problems typically exhibit a decomposable structure. Beside computational efficiency branch-and-price produces two other important advantages in comparison with pure integer programming. Firstly, it often allows for a more accurate problem statement since many constraints which are hard to formulate in the integer program could be easily incorporated in the column generator. Secondly, a branch-and-price algorithm can easily be turned into an effective heuristic when optimality is no major concern. We illustrate these advantages for a medical trainee scheduling problem encountered at Oogziekenhuis Gasthuisberg Leuven and present some computational results together with implementation issues.Advantages; Area; Branch-and-price; Constraint; Efficiency; Heuristic; Integer programming; Model; Models; Problems; Research; Scheduling; Staff scheduling; Structure;

    Real-time scheduling of tertiary storage

    Get PDF
    To prove the efficiency of Promote-IT we implemented alternative schedulers based on different scheduling models and scheduling paradigms. The evaluation shows that Promote-IT performs better than the other heuristic schedulers. Additionally, Promote-IT provides response-times near the optimum in cases where the optimal scheduler can be computed. We developed a toolbox called JukeTools to easily implement, evaluate and compare jukebox schedulers

    Automated telescope scheduling

    Get PDF
    With the ever increasing level of automation of astronomical telescopes the benefits and feasibility of automated planning and scheduling are becoming more apparent. Improved efficiency and increased overall telescope utilization are the most obvious goals. Automated scheduling at some level has been done for several satellite observatories, but the requirements on these systems were much less stringent than on modern ground or satellite observatories. The scheduling problem is particularly acute for Hubble Space Telescope: virtually all observations must be planned in excruciating detail weeks to months in advance. Space Telescope Science Institute has recently made significant progress on the scheduling problem by exploiting state-of-the-art artificial intelligence software technology. What is especially interesting is that this effort has already yielded software that is well suited to scheduling groundbased telescopes, including the problem of optimizing the coordinated scheduling of more than one telescope

    Reliability of Dynamic Load Scheduling with Solar Forecast Scenarios

    Full text link
    This paper presents and evaluates the performance of an optimal scheduling algorithm that selects the on/off combinations and timing of a finite set of dynamic electric loads on the basis of short term predictions of the power delivery from a photovoltaic source. In the algorithm for optimal scheduling, each load is modeled with a dynamic power profile that may be different for on and off switching. Optimal scheduling is achieved by the evaluation of a user-specified criterion function with possible power constraints. The scheduling algorithm exploits the use of a moving finite time horizon and the resulting finite number of scheduling combinations to achieve real-time computation of the optimal timing and switching of loads. The moving time horizon in the proposed optimal scheduling algorithm provides an opportunity to use short term (time moving) predictions of solar power based on advection of clouds detected in sky images. Advection, persistence, and perfect forecast scenarios are used as input to the load scheduling algorithm to elucidate the effect of forecast errors on mis-scheduling. The advection forecast creates less events where the load demand is greater than the available solar energy, as compared to persistence. Increasing the decision horizon leads to increasing error and decreased efficiency of the system, measured as the amount of power consumed by the aggregate loads normalized by total solar power. For a standalone system with a real forecast, energy reserves are necessary to provide the excess energy required by mis-scheduled loads. A method for battery sizing is proposed for future work.Comment: 6 pager, 4 figures, Syscon 201
    corecore