Project risk management for community-based post-disaster housing reconstruction project
Indonesia is a highly disaster prone country, particularly to earthquakes. In the last decade,
Indonesia has been hit by three large earthquakes; Aceh in December 2004, Yogyakarta in
May 2006, and West Sumatra in September 2009. These earthquakes have created
considerable losses to Indonesian communities, lead to 130,000 fatalities, US$10.3 billions
economic losses, and 500,000 of heavily damaged houses. The massive housing
reconstruction has been found to be the most problematic sector of housing reconstruction
programme. Although community-based post-disaster housing reconstruction project
(CPHRP) has been implemented, nevertheless the outcome was still overshadowed by the
delay in delivery, cost escalation, unexpected quality, and community dissatisfaction. The
implementation of good practice of project risk management in construction industry is
expected to enhance the success of CPHRP. Accordingly, this study aims to develop a risk
management model for community-based post-disaster housing reconstruction approach.
In order to achieve the aim and objective of the research, multiple case studies is selected as
research strategies. This study implements the sequential mixed method application, started
with semi-structure interview and followed by questionnaire survey as the primary method.
Content analysis was used to analyse qualitative data, whilst descriptive and inferential
statistics were deployed to analyse quantitative data.
This study reveals the importance of the understanding on community-based approach in
post-disaster housing reconstruction. Four highly significant advantages of CPHRP have been
discovered, with ‘create sense of ownership’ of beneficiaries to the project as the most
significant advantage. It was also found that the psychological advantage of CPHRP is more
dominant compare to the construction advantage. Further, the risk assessment has discovered
some high risk events during the pre-construction stage of CPHRP. The most affected project
objective by them is project time completion. Risk response document has also been
proposed. Moreover, this study found twelve critical success factors (CSFs) of CPHRP, with
the highest CSFs is ‘transparency and accountability’. With careful attention on the above
findings, it is expected the success of the implementation of CPHRP can be increase
Project Portfolio Management Prototype Application Design
The management of project portfolio in a company requires the use of specific software, especially when the number of projects is significant. This paper is based on the Methodology for the development of IT projects portfolio management applications research project. This paper presents some of the results of a project portfolio application design.project management, project portfolio management, applications development.
Decreasing Caregiver Stress
Stress is both critical and personal experience and has significant effects on caregivers’ physical, mental, and social well-being. The nature of caregiving and the responsibility to work and serve individuals at their illness conditions are very personal encounters that often result in adverse effects on the health and well-being of caregivers (Frederick, 2016). A decrease in stress experience can lead to the satisfaction of caregiver roles and improvement of patient’s quality of life (Choi, Jisun & Boyle, Diane, 2013; Yada, Nagata, & Inagaki, 2014). This scholarly project determined that evidence-based stress management interventions have decreased the perceived stress in caregivers. The scholarly project identified low levels of stress among research participants, and how evidence-based interventions decreased caregiver stress by increasing their knowledge and awareness of evidence-based stress management interventions. The results of this scholarly project agree with the literature that caregiver stress experience can be decreased through the implementation of evidence-based stress management interventions (Blom, Zarit, Groot Zwaaftink, Cuijpers, & Pot, 2013). It is significant to implement evidence-based stress management interventions to decrease perceived stress among caregivers
PROJECT-BASES RISK MANAGEMENT
The project-bases concept is presented. There are defined operations on project-bases. The software developed for project-bases management is analyzed based in its structure and functionality. A series of criteria of structuring risks is listed are tailored for project-bases management. Next there are suggested solutions of mitigating risks by maintaining efficiency within acceptable thresholds.risk, project-base, software, management
Electronic Construction Collaboration System – Phase III, December 2011
This phase of the electronic collaboration project involved two major efforts: 1) implementation of AEC Sync (formerly known as Attolist), a web-based project management system (WPMS), on the Broadway Viaduct Bridge Project and the Iowa Falls Arch Bridge Project and 2) development of a web-based project management system for bridge and highway construction projects with less than $10 million in contract value.
During the previous phase of this project (fiscal year 2010), the research team helped with the implementation process for AEC Sync and collected feedback from the Broadway Viaduct project team members before the start of the project. During the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results.
The results of the AEC Sync implementation on the Broadway project were positive. The project members were satisfied with the performance of the AEC Sync software and how it facilitated document management and its transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge Project. The implementation of AEC Sync for the Iowa Falls Arch Bridge Project appears to also be positive, based on the pre-project surveys.
The fourth phase of this electronic collaboration project involves the identification and implementation of a WPMS solution for smaller bridge and highway projects. The workflow for the shop drawing approval process for sign truss projects was documented and used to identify possible WPMS solutions. After testing and evaluating several WPMS solutions, Microsoft SharePoint Foundation’s site pages were selected to be pilot-tested on sign truss projects. Due to the limitation on the SharePoint license that the Iowa Department of Transportation (DOT) has, a file transfer protocol (FTP) site will be developed alongside this site to allow contractors to upload shop drawings to the Iowa DOT. The SharePoint site pages are expected to be ready for implementation during the 2012 calendar year
Managing Knowledge in Project Environments
Projects ought to be vehicles for both practical benefits and organizational learning. However, if an organization is designed for the long term, a project exists only for its duration. Project-based organizations face an awkward dilemma: the project-centric nature of their work makes knowledge management, hence learning, difficult
A Complexity Science Based Approach to Programme Risk Management
Programme management has rapidly gained acceptance as a vehicle for achieving organisational strategic objectives and as a means of aligning projects with the overall strategy of the organisation. Managing programme risk poses challenges which are different from those in project management. Attempts to modify and apply project risk management techniques to programme risk management have experienced difficulties. The implications of the challenges of programme risk management extend beyond the tools and techniques. Recent research shows that that programme management is neither an extension, nor a scaled up version of project management. Philosophically, a paradigm shift from the predominantly mechanistic and reductionist mindset to a more appropriate paradigm based on complexity science and the theory of complex adaptive systems is required. This leads to the conclusion that the classic event based view of risk is inappropriate in modelling and analysing programme risk which need to be treated as holistic and dynamic
Sunamganj community based resource management project (SCBRMP): an approach to sustainable beel fisheries management
Sunamganj is a land dominated by floodplains with seasonally flooded tectonic depressions known locally as haors and smaller water bodies known as beels. PeopleÆs livelihoods and culture are largely dominated by the haor economy where beel fisheries play a very critical role. Although the beel has a wide range of resources, the people at large have not been able to benefit from them. A small number of people by virtue of their power and influence have been exploiting the resources overriding all the codes of resource management and maintenance.Fishery management, Flood plains, Bangladesh,
- …