    Project method

    Get PDF
    The project method originates from Pragmatism, the philosophical movement which appeared in the middle of the 19th century and promotes action and practical application of knowledge in everyday life. Major proponents of Pragmatism were J. Dewey (1935) and W. Kilpatrick (1935) in the USA and H. Gaudig in Germany. When you are citing the document, use the following link http://essuir.sumdu.edu.ua/handle/123456789/3113

    Progress in large-shared projects : method for forecasting and optimizing project duration in a distributed project

    Get PDF
    In large-shared projects, it is still difficult to measure progress due to the complexities involved, because the realization is shared among departments of a company or among companies in the world. Project management and operations research literature is reviewed for discovering various techniques applicable. Widely used tools for progress measurement and forecasting, such as Earned Value Analysis, Progress Plot, Milestone and Resource slip charts, concurrent engineering, can be employed. This paper is based on a problem of pharmaceutical industry where the effectiveness of a certain medical treatment is examined on patients in a number of countries. The number of variables involved increase the complexity of this problem. The main objective is to analyze the effectiveness of a solution in different situations during the project such that a better project duration and a lower cost can be achieved. Our findings suggest that reallocation of patients among countries produces better results in terms of progress

    Evaluation method of the innovation project global efficiency

    Get PDF
    A complete system of indexes to evaluate the global efficiency of a new product development project must approach at least the following perspectives: the financial performances of the project; the project's value; the technical performances of the project; the efficiency of research and development activities of the project; the capacity of fitting in the estimated cost and duration of activities; the degree of integration between the R&D and production activities; the degree of integration between the R&D and marketing activities. Therefore, in this paper is drawn up a method for new product development projects evaluation, based on those seven perspectives.innovation project, evaluation method, value, financial performances

    Predicting software project effort: A grey relational analysis based method

    Get PDF
    This is the post-print version of the final paper published in Expert Systems with Applications. The published article is available from the link below. Changes resulting from the publishing process, such as peer review, editing, corrections, structural formatting, and other quality control mechanisms may not be reflected in this document. Changes may have been made to this work since it was submitted for publication. Copyright @ 2011 Elsevier B.V.The inherent uncertainty of the software development process presents particular challenges for software effort prediction. We need to systematically address missing data values, outlier detection, feature subset selection and the continuous evolution of predictions as the project unfolds, and all of this in the context of data-starvation and noisy data. However, in this paper, we particularly focus on outlier detection, feature subset selection, and effort prediction at an early stage of a project. We propose a novel approach of using grey relational analysis (GRA) from grey system theory (GST), which is a recently developed system engineering theory based on the uncertainty of small samples. In this work we address some of the theoretical challenges in applying GRA to outlier detection, feature subset selection, and effort prediction, and then evaluate our approach on five publicly available industrial data sets using both stepwise regression and Analogy as benchmarks. The results are very encouraging in the sense of being comparable or better than other machine learning techniques and thus indicate that the method has considerable potential.National Natural Science Foundation of Chin

    A statistical method for estimating activity uncertainty parameters to improve project forecasting

    Get PDF
    Just like any physical system, projects have entropy that must be managed by spending energy. The entropy is the project’s tendency to move to a state of disorder (schedule delays, cost overruns), and the energy process is an inherent part of any project management methodology. In order to manage the inherent uncertainty of these projects, accurate estimates (for durations, costs, resources, …) are crucial to make informed decisions. Without these estimates, managers have to fall back to their own intuition and experience, which are undoubtedly crucial for making decisions, but are are often subject to biases and hard to quantify. This paper builds further on two published calibration methods that aim to extract data from real projects and calibrate them to better estimate the parameters for the probability distributions of activity durations. Both methods rely on the lognormal distribution model to estimate uncertainty in activity durations and perform a sequence of statistical hypothesis tests that take the possible presence of two human biases into account. Based on these two existing methods, a new so-called statistical partitioning heuristic is presented that integrates the best elements of the two methods to further improve the accuracy of estimating the distribution of activity duration uncertainty. A computational experiment has been carried out on an empirical database of 83 empirical projects. The experiment shows that the new statistical partitioning method performs at least as good as, and often better than, the two existing calibration methods. The improvement will allow a better quantification of the activity duration uncertainty, which will eventually lead to a better prediction of the project schedule and more realistic expectations about the project outcomes. Consequently, the project manager will be able to better cope with the inherent uncertainty (entropy) of projects with a minimum managerial effort (energy)

    How was it for you? Experiences of participatory design in the UK health service

    Get PDF
    Improving co-design methods implies that we need to understand those methods, paying attention to not only the effect of method choices on design outcomes, but also how methods affect the people involved in co-design. In this article, we explore participants' experiences from a year-long participatory health service design project to develop ‘Better Outpatient Services for Older People’. The project followed a defined method called experience-based design (EBD), which represented the state of the art in participatory service design within the UK National Health Service. A sample of participants in the project took part in semi-structured interviews reflecting on their involvement in and their feelings about the project. Our findings suggest that the EBD method that we employed was successful in establishing positive working relationships among the different groups of stakeholders (staff, patients, carers, advocates and design researchers), although conflicts remained throughout the project. Participants' experiences highlighted issues of wider relevance in such participatory design: cost versus benefit, sense of project momentum, locus of control, and assumptions about how change takes place in a complex environment. We propose tactics for dealing with these issues that inform the future development of techniques in user-centred healthcare design

    Design and Implementation of a Method Base Management System for a Situational CASE Environment

    Get PDF
    Situational method engineering focuses on configuration of system development methods (SDMs) tuned to the situation of a project at hand. Situational methods are assembled from parts of existing SDMs, so called method fragments, that are selected to match the project situation. The complex task of selecting appropriate method fragments and assembling them into a method requires effective automated support. The paper describes the architecture of a tool prototype offering such support. We present the structure of its central repository, a method base containing method fragments. The functions to store, select and assemble these method fragments are offered by a stratified method base management system tool component, which is described as wel