3 research outputs found

    NI-DPU ASW v1.3.8 Test Plan and Test Report

    Get PDF
    The objective of this document is to provide the test plan carried out on v1.3.8 of the DPU ASW and to report the test results. All tests were done at system level. This document is focused on the ASW test phase carried out on DPU AVM at TAS premises in Turin after its qualification to validate the applicative before installing it on DPU FM unit

    Zero Bias Configuration - validation test using the NI-PLM setup

    Get PDF
    The validation of the ZBC procedure applied to the NISP flight hardware is describe
    corecore