111 research outputs found

    Implementing patient flow based resource allocation decision support models in hospitals

    Get PDF

    Het afspraaksysteem voor het polyklinisch spreekuur

    Get PDF

    Master scheduling of medical specialists

    Get PDF

    Exploring new policies for hospital production control

    Get PDF

    Capaciteitsmanagement in het St. Anna Ziekenhuis te Oss

    Get PDF

    Capaciteitsmanagement in het Elisabeth Ziekenhuis te Tilburg

    Get PDF

    Hospital process orientation from an operations management perspective: Development of a measurement tool and practical testing in three ophthalmic practices

    Get PDF
    Background: Although research interest in hospital process orientation (HPO) is growing, the development of a measurement tool to assess process orientation (PO) has not been very successful yet. To view a hospital as a series of processes organized around patients with a similar demand seems to be an attractive proposition, but it is hard to operationalize this idea in a measurement tool that can actually measure the level of PO. This research contributes to HPO from an operations management (OM) perspective by addressing the alignment, integration and coordination of activities within patient care processes. The objective of this study was to develop and practically test a new measurement tool for assessing the degree of PO within hospitals using exist

    Improving operational effectiveness of tactical master plans for emergency and elective patients under stochastic demand and capacitated resources

    Get PDF
    This paper develops a two-stage planning procedure for master planning of elective and emergency patients while allocating at best the available hospital resources. Four types of resources are considered: operating theatre, beds in the medium and in the intensive care units, and nursing hours in the intensive care unit. A tactical plan is obtained by minimizing the deviations of the resources consumption to the target levels of resources utilization. Some capacity is reserved for emergency care. To deal with the deviation between actually arriving patients and the average number of patients on which the tactical plan is based, we consider the option of planning a higher number of patients (overplanning). To adapt the tactical plan to the actual stream of elective patients, we also consider flexibility rules. Overplanning and flexibility leads to a weekly schedule of elective patients. This schedule is modified to account for emergency patients. Scheduled elective patients may be cancelled and emergency patients may be sent to other hospitals. Cancellations rules for both types of patients rely on the possibility to exceed the available capacities. Several performance indicators are defined to assess patient service/dissatisfaction and hospital efficiency. Simulation results show a trade-off between hospital efficiency and patient service. We also obtain a rank of the different strategies: overplanning, flexibility and cancellation rules
    • …
    corecore