17 research outputs found

    DataSheet1_Effect of grain boundary resistance on the ionic conductivity of amorphous xLi2S-(100-x)LiI binary system.docx

    Full text link
    Solid-state electrolytes (SSEs) hold the key position in the progress of cutting-edge all-solid-state batteries (ASSBs). The ionic conductivity of solid-state electrolytes is linked to the presence of both amorphous and crystalline phases. This study employs the synthesis method of mechanochemical milling on binary xLi2S-(100-x)LiI system to investigate the effect of amorphization on its ionic conductivity. Powder X-ray diffraction (PXRD) shows that the stoichiometry of Li2S and LiI has a significant impact on the amorphization of xLi2S-(100-x)LiI system. Furthermore, the analysis of electrochemical impedance spectroscopy (EIS) indicates that the amorphization of xLi2S-(100-x)LiI system is strongly correlated with its ionic conductivity, which is primarily attributed to the effect of grain boundary resistance. These findings uncover the latent connections between amorphization, grain boundary resistance, and ionic conductivity, offering insight into the design of innovative amorphous SSEs.</p

    Exploring the Underlying Correlation between the Structure and Ionic Conductivity in Halide Spinel Solid-State Electrolytes with Neutron Diffraction

    Full text link
    The development of cutting-edge solid-state electrolytes (SSEs) entails a deep understanding of the underlying correlation between the structure and ionic conductivity. Generally, the structure of SSEs encompasses several interconnected crystal parameters, and their collective influence on Li+ transport can be challenging to discern. Here, we systematically investigate the structure–function relationship of halide spinel LixMgCl2+x (2 ≥ x ≥ 1) SSEs. A nonmonotonic trend in the ionic conductivity of LixMgCl2+x SSEs has been observed, with the maximum value of 8.69 × 10–6 S cm–1 achieved at x = 1.4. The Rietveld refinement analysis, based on neutron diffraction data, has revealed that the crystal parameters including cell parameters, Li+ vacancies, Debye–Waller factor, and Li–Cl bond length assume diverse roles in influencing ionic conductivity of LixMgCl2+x at different stages within the range of x values. Besides, mechanistic analysis demonstrates Li+ transport along three-dimensional pathways, which primarily governs the contribution to ionic conductivity of LixMgCl2+x SSEs. This study has shed light on the collective influence of crystal parameters on Li+ transport behaviors, providing valuable insights into the intricate relationship between the structure and ionic conductivity of SSEs

    CEPC Technical Design Report -- Accelerator

    Full text link
    The Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s

    CEPC Technical Design Report -- Accelerator

    Full text link
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s

    CEPC Technical Design Report -- Accelerator

    Full text link
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s
    corecore