43 research outputs found

    Symposium on research at Mound Laboratory, June 6-7, 1963 /

    No full text
    On cover: AEC Research and Development Report."Sponsored jointly by Mound Laboratory and the AEC.""MLM-1163; TID-4500 (26th Ed.); UC-2 General."Includes bibliographical references.U.S. Atomic Energy Commission Contract ;Mode of access: Internet

    Mound Laboratory progress report for

    No full text
    U.S. Atomic Energy Commission Contract ;Mode of access: Internet.Latest issue consulted: MLM-1250, March 1965.Description based on: MLM-1138, June 1962

    Gamma self-absorption in a spherical distributed gamma source /

    No full text
    "Mound Laboratory, Miamisburg, Ohio, operated for United States Atomic Energy Commission, U.S. Government Contract No. AT-33-1-GEN-53.""MLM-1219 ; TID-4500 (35th Ed.) ; UC-34 Physics.""Date: November 6, 1961 ; Issued: February 5, 1965."Includes bibliographical references (p. 8).U.S. Atomic Energy Commission Contract ;Mode of access: Internet

    Heating vacuum-tube cathodes with polonium-210 : feasibility study /

    No full text
    "Issued: May 27, 1964."Includes bibliographical references (page 14).U.S. Atomic Energy Commission Contract ;Mode of access: Internet

    Samples of soil from Arco, Idaho : information report /

    No full text
    Samples from a single drilling made at Arco, Idaho were submitted to determine the adsorptive capacity of soil at Arco, Idaho for radioactive elements.Work performed at the Mound Laboratory."Other issues of this report may have the number MLM-401.""Date Declassified: January 27, 1953.""November 22, 1949.""AECD-3487."Samples from a single drilling made at Arco, Idaho were submitted to determine the adsorptive capacity of soil at Arco, Idaho for radioactive elements.Mode of access: Internet

    Mound Laboratory chemistry and physics progress report.

    No full text
    U.S. Atomic Energy Commission Contract ;Mode of access: Internet

    Separation of polonium from bismuth by distillation /

    No full text
    The experimental work on the separation of polonium from bismuth by distillation during the period from 1949 to 1952 is reviewed. Data are presented showing operation of simple batch stills and of fractionating stills with and without helium sparging. The problem of materials of construction is discussed and data obtained while working on this phase of the project are included. Some of the problems of still design and construction are presented with recommendations for their solution. jg p.5.Work performed at the Mound Laboratory, Miamisburg, Ohio."Date Declassified: November 30, 1955.""August 1, 1953."Includes bibliographical references (p. 42-43).The experimental work on the separation of polonium from bismuth by distillation during the period from 1949 to 1952 is reviewed. Data are presented showing operation of simple batch stills and of fractionating stills with and without helium sparging. The problem of materials of construction is discussed and data obtained while working on this phase of the project are included. Some of the problems of still design and construction are presented with recommendations for their solution. jg p.5.Mode of access: Internet

    Mound Laboratory isotopic power fuels program.

    No full text
    U.S. Atomic Energy Commission Contract ;Operated for United States Atomic Energy CommissionMode of access: Internet.Latest issue consulted: MLM-1887, October-December 1971.Description based on: MLM-1827, April-September 1971

    Quantitative enrichment of C¹⁴ in a fractionating column for dating purposes /

    No full text
    "Monsanto Research Corporation"--Cover."Mound Laboratory, Miamisburg, Ohio, operated for United States Atomic Energy Commission U.S. Government Contract no. AT-33-1-GEN-53.""This manuscript was originally published in Kernenergie, 5 (4/5), 278-280 (1962). The paper was translated at Kresge-Hooker Science Library Services by Siegfried Arthur Muller.""Issued: November 6, 1964.""MLM-1198 (tr) ; TID-4500 (29th Ed.) ; UC-23, Isotopes--Industrial Technology."Includes bibliographical references (page 5).Mode of access: Internet

    Inspection and recanning program of PuBe neutron sources /

    No full text
    "Issued: May 1, 1964""Date: January 7, 1964"Includes bibliographic references.U.S. Atomic Energy Commission Contract ;Mode of access: Internet
    corecore