2,450 research outputs found
Proposal for SPS beam time for the baby MIND and TASD neutrino detector prototypes
The design, construction and testing of neutrino detector prototypes at CERN
are ongoing activities. This document reports on the design of solid state baby
MIND and TASD detector prototypes and outlines requirements for a test beam at
CERN to test these, tentatively planned on the H8 beamline in the North Area,
which is equipped with a large aperture magnet. The current proposal is
submitted to be considered in light of the recently approved projects related
to neutrino activities with the SPS in the North Area in the medium term
2015-2020
A Very Intense Neutrino Super Beam Experiment for Leptonic CP Violation Discovery based on the European Spallation Source Linac: A Snowmass 2013 White Paper
Very intense neutrino beams and large neutrino detectors will be needed in
order to enable the discovery of CP violation in the leptonic sector. We
propose to use the proton linac of the European Spallation Source currently
under construction in Lund, Sweden to deliver, in parallel with the spallation
neutron production, a very intense, cost effective and high performance
neutrino beam. The baseline program for the European Spallation Source linac is
that it will be fully operational at 5 MW average power by 2022, producing 2
GeV 2.86 ms long proton pulses at a rate of 14 Hz. Our proposal is to upgrade
the linac to 10 MW average power and 28 Hz, producing 14 pulses/s for neutron
production and 14 pulses/s for neutrino production. Furthermore, because of the
high current required in the pulsed neutrino horn, the length of the pulses
used for neutrino production needs to be compressed to a few s with the
aid of an accumulator ring. A long baseline experiment using this Super Beam
and a megaton underground Water Cherenkov detector located in existing mines
300-600 km from Lund will make it possible to discover leptonic CP violation at
5 significance level in up to 50% of the leptonic Dirac CP-violating
phase range. This experiment could also determine the neutrino mass hierarchy
at a significance level of more than 3 if this issue will not already
have been settled by other experiments by then. The mass hierarchy performance
could be increased by combining the neutrino beam results with those obtained
from atmospheric neutrinos detected by the same large volume detector. This
detector will also be used to measure the proton lifetime, detect cosmological
neutrinos and neutrinos from supernova explosions. Results on the sensitivity
to leptonic CP violation and the neutrino mass hierarchy are presented.Comment: 28 page
Baby MIND: A magnetised spectrometer for the WAGASCI experiment
The WAGASCI experiment being built at the J-PARC neutrino beam line will
measure the difference in cross sections from neutrinos interacting with a
water and scintillator targets, in order to constrain neutrino cross sections,
essential for the T2K neutrino oscillation measurements. A prototype Magnetised
Iron Neutrino Detector (MIND), called Baby MIND, is being constructed at CERN
to act as a magnetic spectrometer behind the main WAGASCI target to be able to
measure the charge and momentum of the outgoing muon from neutrino charged
current interactions.Comment: Poster presented at NuPhys2016 (London, 12-14 December 2016). Title +
4 pages, LaTeX, 6 figure
Synchronization of the Distributed Readout Frontend Electronics of the Baby MIND Detector
Baby MIND is a new downstream muon range detector for the WGASCI experiment. This article discusses the distributed readout system and its timing requirements. The paper presents the design of the synchronization subsystem and the results of its test
Baby MIND Experiment Construction Status
Baby MIND is a magnetized iron neutrino detector, with novel design features,
and is planned to serve as a downstream magnetized muon spectrometer for the
WAGASCI experiment on the T2K neutrino beam line in Japan. One of the main
goals of this experiment is to reduce systematic uncertainties relevant to
CP-violation searches, by measuring the neutrino contamination in the
anti-neutrino beam mode of T2K. Baby MIND is currently being constructed at
CERN, and is planned to be operational in Japan in October 2017.Comment: Poster presented at NuPhys2016 (London, 12-14 December 2016). 4
pages, LaTeX, 7 figure
Baby MIND: A magnetized segmented neutrino detector for the WAGASCI experiment
T2K (Tokai-to-Kamioka) is a long-baseline neutrino experiment in Japan
designed to study various parameters of neutrino oscillations. A near detector
complex (ND280) is located 280~m downstream of the production target and
measures neutrino beam parameters before any oscillations occur. ND280's
measurements are used to predict the number and spectra of neutrinos in the
Super-Kamiokande detector at the distance of 295~km. The difference in the
target material between the far (water) and near (scintillator, hydrocarbon)
detectors leads to the main non-cancelling systematic uncertainty for the
oscillation analysis. In order to reduce this uncertainty a new
WAter-Grid-And-SCintillator detector (WAGASCI) has been developed. A magnetized
iron neutrino detector (Baby MIND) will be used to measure momentum and charge
identification of the outgoing muons from charged current interactions. The
Baby MIND modules are composed of magnetized iron plates and long plastic
scintillator bars read out at the both ends with wavelength shifting fibers and
silicon photomultipliers. The front-end electronics board has been developed to
perform the readout and digitization of the signals from the scintillator bars.
Detector elements were tested with cosmic rays and in the PS beam at CERN. The
obtained results are presented in this paper.Comment: In new version: modified both plots of Fig.1 and added one sentence
in the introduction part explaining Baby MIND role in WAGASCI experiment,
added information for the affiliation
Interim Design Report
The International Design Study for the Neutrino Factory (the IDS-NF) was
established by the community at the ninth "International Workshop on Neutrino
Factories, super-beams, and beta- beams" which was held in Okayama in August
2007. The IDS-NF mandate is to deliver the Reference Design Report (RDR) for
the facility on the timescale of 2012/13. In addition, the mandate for the
study [3] requires an Interim Design Report to be delivered midway through the
project as a step on the way to the RDR. This document, the IDR, has two
functions: it marks the point in the IDS-NF at which the emphasis turns to the
engineering studies required to deliver the RDR and it documents baseline
concepts for the accelerator complex, the neutrino detectors, and the
instrumentation systems. The IDS-NF is, in essence, a site-independent study.
Example sites, CERN, FNAL, and RAL, have been identified to allow site-specific
issues to be addressed in the cost analysis that will be presented in the RDR.
The choice of example sites should not be interpreted as implying a preferred
choice of site for the facility
High intensity neutrino oscillation facilities in Europe
The EUROnu project has studied three possible options for future, high intensity neutrino oscillation facilities in Europe. The first is a Super Beam, in which the neutrinos come from the decay of pions created by bombarding targets with a 4 MW proton beam from the CERN High Power Superconducting Proton Linac. The far detector for this facility is the 500 kt MEMPHYS water Cherenkov, located in the Fréjus tunnel. The second facility is the Neutrino Factory, in which the neutrinos come from the decay of μ+ and μ− beams in a storage ring. The far detector in this case is a 100 kt magnetized iron neutrino detector at a baseline of 2000 km. The third option is a Beta Beam, in which the neutrinos come from the decay of beta emitting isotopes, in particular He6 and Ne18, also stored in a ring. The far detector is also the MEMPHYS detector in the Fréjus tunnel. EUROnu has undertaken conceptual designs of these facilities and studied the performance of the detectors. Based on this, it has determined the physics reach of each facility, in particular for the measurement of CP violation in the lepton sector, and estimated the cost of construction. These have demonstrated that the best facility to build is the Neutrino Factory. However, if a powerful proton driver is constructed for another purpose or if the MEMPHYS detector is built for astroparticle physics, the Super Beam also becomes very attractive
Differential branching fraction and angular analysis of the decay B0→K∗0μ+μ−
The angular distribution and differential branching fraction of the decay B 0→ K ∗0 μ + μ − are studied using a data sample, collected by the LHCb experiment in pp collisions at s√=7 TeV, corresponding to an integrated luminosity of 1.0 fb−1. Several angular observables are measured in bins of the dimuon invariant mass squared, q 2. A first measurement of the zero-crossing point of the forward-backward asymmetry of the dimuon system is also presented. The zero-crossing point is measured to be q20=4.9±0.9GeV2/c4 , where the uncertainty is the sum of statistical and systematic uncertainties. The results are consistent with the Standard Model predictions
- …