49 research outputs found

    Power system static and dynamic security studies for the 1st phase of Crete Island Interconnection

    Get PDF
    The island of Crete is currently served by an autonomous electrical system being fed by oil-fired (Heavy fuel or light Diesel oil) thermal power plants and renewables (wind and PVs). The peak load and annual electric energy consumption are approximately 600 MW and 3 TWh respectively; wind and photovoltaic parks contribute approximately 20% of the electricity needs of the island. Due to the expensive fuel used, the Cretan power system has very high electric energy generation cost compared to the Greek mainland. On the other side the limited size of the system poses severe limitations to the penetration of renewable energy sources, not allowing to further exploit the high wind and solar potential of the island. According to the Ten Year Network Development Plan (TYNDP) of the Greek TSO (Independent Power Transmission Operator S.A. IPTO S.A.), the interconnection of Crete to the mainland Transmission System of Greece will be realized through two links: A 150 kV HVAC link between the Peloponnese and the Crete (Phase I) and a HVDC link connecting the metropolitan area of Athens with Crete (Phase II). The total length of submarine and underground cable of the HVAC link will be approximately 174km; it is at the limits of the AC technology and the longest and deepest worldwide at 150 kV level. A number of studies have been conducted by a joint group of IPTO and Hellenic Electricity Distribution Network Operator (HEDNO) for the design of this interconnection. This paper presents briefly the power system static and dynamic studies conducted for the design of the AC link and its operation. Firstly, the paper presents the main results of the static security study regarding the calculation of the maximum power transfer capability of the link and the selection of the reactive power compensation scheme of the cable. Results from dynamic security analysis studies are also presented. The small-signal stability analysis concludes that a new (intra-area) electromechanical oscillation is introduced to the National System after the interconnection. The damping of the electromechanical oscillations is sufficient; however the operation of power system stabilizers at power plants located both at the mainland and at Crete power system can increase significantly the damping of important oscillation modes. Finally with respect to the risk of loss of synchronism after a significant disturbance in the system of Crete, such as a three-phase fault (“transient stability”)- enough safety margin is estimated by means of Critical Clearing Time calculations

    Power system static and dynamic security studies for the 1st phase of Crete Island Interconnection

    Get PDF
    The island of Crete is currently served by an autonomous electrical system being fed by oil-fired (Heavy fuel or light Diesel oil) thermal power plants and renewables (wind and PVs). The peak load and annual electric energy consumption are approximately 600 MW and 3 TWh respectively; wind and photovoltaic parks contribute approximately 20% of the electricity needs of the island. Due to the expensive fuel used, the Cretan power system has very high electric energy generation cost compared to the Greek mainland. On the other side the limited size of the system poses severe limitations to the penetration of renewable energy sources, not allowing to further exploit the high wind and solar potential of the island. According to the Ten Year Network Development Plan (TYNDP) of the Greek TSO (Independent Power Transmission Operator S.A. IPTO S.A.), the interconnection of Crete to the mainland Transmission System of Greece will be realized through two links: A 150 kV HVAC link between the Peloponnese and the Crete (Phase I) and a HVDC link connecting the metropolitan area of Athens with Crete (Phase II). The total length of submarine and underground cable of the HVAC link will be approximately 174km; it is at the limits of the AC technology and the longest and deepest worldwide at 150 kV level. A number of studies have been conducted by a joint group of IPTO and Hellenic Electricity Distribution Network Operator (HEDNO) for the design of this interconnection. This paper presents briefly the power system static and dynamic studies conducted for the design of the AC link and its operation. Firstly, the paper presents the main results of the static security study regarding the calculation of the maximum power transfer capability of the link and the selection of the reactive power compensation scheme of the cable. Results from dynamic security analysis studies are also presented. The small-signal stability analysis concludes that a new (intra-area) electromechanical oscillation is introduced to the National System after the interconnection. The damping of the electromechanical oscillations is sufficient; however the operation of power system stabilizers at power plants located both at the mainland and at Crete power system can increase significantly the damping of important oscillation modes. Finally with respect to the risk of loss of synchronism after a significant disturbance in the system of Crete, such as a three-phase fault (“transient stability”)- enough safety margin is estimated by means of Critical Clearing Time calculations

    Power system regulation planning and control with the support of an energy market simulator

    Get PDF
    Energy market simulation has a role to play in regulation, planning and control of liberalised electricity markets. The development and evolution of such markets internationally has focused the needs of different stakeholders within these markets over a variety of time scales. This paper describes the main objectives and principal assumptions for development and implementation of energy market simulators. The authors describe the background requirements and needs from the perspective of different user groups for this kind of tool. Examples of possible applications are presented for the use of a market simulator and data requirements and indications for a practical realisation of models have also been included

    Road map of India [cartographic material].

    No full text
    2nd ed. 1962. Road map of India showing international and state boundaries, transportation, water features, places of tourist interest, places for petrol, antiquity sites and populated places. Relief shown by shading.; "Refer to this map as:- 1:2 500 000 road map of India second edition"; Inset: List of important places.; "Reg. No. 7167 HD'61-10,000'63"; Also available online http://nla.gov.au/nla.map-vn1658302

    AUTONOMOUS SYSTEM EXPANSION PLANNING CONSIDERING RENEWABLE ENERGY-SOURCES - A COMPUTER PACKAGE

    No full text

    Short term reliability and cost of operation for an autonomous energy system

    No full text

    Optimum expansion planning of an unconventional generation system operating in parallel with a large scale network

    No full text

    Application of interruptible contracts to increase wind-power penetration in congested areas

    No full text

    Designing Controls to Increase Wind Power Penetration in Weakly Connected Areas of the Hellenic Interconnected System

    No full text