24 research outputs found
A standard design for collecting vegetation reference spectra: Implementation and implications for data sharing
A Schema for Capturing and Comparing Parametric Spatial Data
In this paper, the authors consider the problem of architectural spatial performance indicators for assessing computer generated design, where identification and analysis of meaningful and relevant spatial qualities is the target of assessment. The paper presents a parametric spatial analysis schema and spatial database structure for the restricted, but still significant, domain of residential housing. A process for the capture and comparison of different types of architectural spatial data is described where analysis focuses on a series of 2D metric and topological spatial measures. The process is then demonstrated in our discussion of a descriptive scenario
Land cover mapping in a Salinised Dryland farming area in southeastern Australia using landsat TM data
Similar Concepts, Distinct Solutions, Common Problems: Learning from PLM and BIM Deployment
Part 1: BIM Operations, Maintenance and RenovationInternational audienceThis paper describes the similarities and differences between Product Lifecycle Management and Building Information Modelling concepts, focusing on integration issues relative to their methods, information systems, effects and criticisms. In this literature based discussion, the authors show that the two concepts share fundamental similarities but are distinct in their scope and level of integration as well as maturity of process and workflow management. The paper highlights several common problems and aims to provide guidance for deployment initiatives
BIM and PLM: Comparing and learning from changes to professional practice across sectors
This paper explores the effects of PLM and BIM on professional practice. It draws on existing literature documenting the experiences of both communities of practice to explain shifts in professional boundaries. A review of case study based literature compares the nature of changes triggered by PLM and BIM relative to the new activities, roles/responsibilities and knowledge competencies, and supply chain relationships. The paper synthesises these changes and reflects PLM and BIM experiences against each other so as to contrast the continuing evolution of professional practice and lessons learned