159 research outputs found
A Very Intense Neutrino Super Beam Experiment for Leptonic CP Violation Discovery based on the European Spallation Source Linac: A Snowmass 2013 White Paper
Very intense neutrino beams and large neutrino detectors will be needed in
order to enable the discovery of CP violation in the leptonic sector. We
propose to use the proton linac of the European Spallation Source currently
under construction in Lund, Sweden to deliver, in parallel with the spallation
neutron production, a very intense, cost effective and high performance
neutrino beam. The baseline program for the European Spallation Source linac is
that it will be fully operational at 5 MW average power by 2022, producing 2
GeV 2.86 ms long proton pulses at a rate of 14 Hz. Our proposal is to upgrade
the linac to 10 MW average power and 28 Hz, producing 14 pulses/s for neutron
production and 14 pulses/s for neutrino production. Furthermore, because of the
high current required in the pulsed neutrino horn, the length of the pulses
used for neutrino production needs to be compressed to a few s with the
aid of an accumulator ring. A long baseline experiment using this Super Beam
and a megaton underground Water Cherenkov detector located in existing mines
300-600 km from Lund will make it possible to discover leptonic CP violation at
5 significance level in up to 50% of the leptonic Dirac CP-violating
phase range. This experiment could also determine the neutrino mass hierarchy
at a significance level of more than 3 if this issue will not already
have been settled by other experiments by then. The mass hierarchy performance
could be increased by combining the neutrino beam results with those obtained
from atmospheric neutrinos detected by the same large volume detector. This
detector will also be used to measure the proton lifetime, detect cosmological
neutrinos and neutrinos from supernova explosions. Results on the sensitivity
to leptonic CP violation and the neutrino mass hierarchy are presented.Comment: 28 page
A Feasibility Experiment of a W-powder Target
The development of high‐powertargetsremains a key R&D actvity for future facilities presently under study like the Neutrino Factory, Muon Collider or upgraded high‐power super beams for long‐baseline neutrino experiments. The choice of materials to sustain the beam power ranging up to MW levels is not trivial.Granular solid targets have been proposed and are being studied as a candidate for such high-power target systems. In the recently commissioned HiRadMat facility at CERN, a feasibility experiment of a tungsten powder target was performed. The experiment was designed to explore for first time the impact of a high‐power proton beam on a static W powder target in a thimble configuration. The diagnostics of the experiment were based on remote high‐speed photography as well as on laser‐doppler vibration measurements of the target containers. Results from the experimental findings are presented in this poster
Recommended from our members
High-Power Targets: Experience and R&D for 2 MW
High-power particle production targets are crucial elements of future neutrino and other rare particle beams. Fermilab plans to produce a beam of neutrinos (LBNE) with a 2.3 MW proton beam (Project X). Any solid target is unlikely to survive for an extended period in such an environment - many materials would not survive a single beam pulse. We are using our experience with previous neutrino and antiproton production targets, along with a new series of R&D tests, to design a target that has adequate survivability for this beamline. The issues considered are thermal shock (stress waves), heat removal, radiation damage, radiation accelerated corrosion effects, physics/geometry optimization and residual radiation
High intensity neutrino oscillation facilities in Europe
The EUROnu project has studied three possible options for future, high intensity neutrino oscillation facilities in Europe. The first is a Super Beam, in which the neutrinos come from the decay of pions created by bombarding targets with a 4 MW proton beam from the CERN High Power Superconducting Proton Linac. The far detector for this facility is the 500 kt MEMPHYS water Cherenkov, located in the Fréjus tunnel. The second facility is the Neutrino Factory, in which the neutrinos come from the decay of μ+ and μ− beams in a storage ring. The far detector in this case is a 100 kt magnetized iron neutrino detector at a baseline of 2000 km. The third option is a Beta Beam, in which the neutrinos come from the decay of beta emitting isotopes, in particular He6 and Ne18, also stored in a ring. The far detector is also the MEMPHYS detector in the Fréjus tunnel. EUROnu has undertaken conceptual designs of these facilities and studied the performance of the detectors. Based on this, it has determined the physics reach of each facility, in particular for the measurement of CP violation in the lepton sector, and estimated the cost of construction. These have demonstrated that the best facility to build is the Neutrino Factory. However, if a powerful proton driver is constructed for another purpose or if the MEMPHYS detector is built for astroparticle physics, the Super Beam also becomes very attractive
Laboratory realization of relativistic pair-plasma beams
Relativistic electron-positron plasmas are ubiquitous in extreme astrophysical environments such as black-hole and neutron-star magnetospheres, where accretion-powered jets and pulsar winds are expected to be enriched with electron-positron pairs. Their role in the dynamics of such environments is in many cases believed to be fundamental, but their behavior differs significantly from typical electron-ion plasmas due to the matter-antimatter symmetry of the charged components. So far, our experimental inability to produce large yields of positrons in quasi-neutral beams has restricted the understanding of electron-positron pair plasmas to simple numerical and analytical studies, which are rather limited. We present the first experimental results confirming the generation of high-density, quasi-neutral, relativistic electron-positron pair beams using the 440 GeV/c beam at CERN’s Super Proton Synchrotron (SPS) accelerator. Monte Carlo simulations agree well with the experimental data and show that the characteristic scales necessary for collective plasma behavior, such as the Debye length and the collisionless skin depth, are exceeded by the measured size of the produced pair beams. Our work opens up the possibility of directly probing the microphysics of pair plasmas beyond quasi-linear evolution into regimes that are challenging to simulate or measure via astronomical observations
Interim Design Report
The International Design Study for the Neutrino Factory (the IDS-NF) was
established by the community at the ninth "International Workshop on Neutrino
Factories, super-beams, and beta- beams" which was held in Okayama in August
2007. The IDS-NF mandate is to deliver the Reference Design Report (RDR) for
the facility on the timescale of 2012/13. In addition, the mandate for the
study [3] requires an Interim Design Report to be delivered midway through the
project as a step on the way to the RDR. This document, the IDR, has two
functions: it marks the point in the IDS-NF at which the emphasis turns to the
engineering studies required to deliver the RDR and it documents baseline
concepts for the accelerator complex, the neutrino detectors, and the
instrumentation systems. The IDS-NF is, in essence, a site-independent study.
Example sites, CERN, FNAL, and RAL, have been identified to allow site-specific
issues to be addressed in the cost analysis that will be presented in the RDR.
The choice of example sites should not be interpreted as implying a preferred
choice of site for the facility
Long-Baseline Neutrino Facility (LBNF) and Deep Underground Neutrino Experiment (DUNE) Conceptual Design Report Volume 2: The Physics Program for DUNE at LBNF
The Physics Program for the Deep Underground Neutrino Experiment (DUNE) at
the Fermilab Long-Baseline Neutrino Facility (LBNF) is described
- …