30 research outputs found
ESTIMATION OF EXTERNAL COSTS OF ELECTRICITY GENERATION USING EXTERNE MODEL
The external costs of electricity generation can be characterised by the resulting social and environmental impacts. The most significant impacts are the air pollutions impact on health, built in environment, crops, forests, agricultural areas and on global warming. The primary impact considered is the air pollution’s effect on human health. The monetised value of the health impact, the external costs are calculated for two regional coal power plants, the effects are examined on the EU level with the ExternE methodology.External costs, human health, monetized environmental impacts, energy production, coal power plants, air pollution, Environmental Economics and Policy, Health Economics and Policy, Research Methods/ Statistical Methods,
Improving Safety: Current and Future Nuclear Reactors
THE ELEMENTS FOR THE PROPOSAL ALARA (As-Low-As-Reasonably-Achievable) is an early principle, adopted for Radioprotection & disconnected from DSA. IA (Independent Assessment) is a requirement, pursued only in principle: a wish rather than an achievement . BEPU (Best Estimate Plus Uncertainty) is a key approach [origin of the term: nuclear thermal-hydraulics and AA during the ‘90s], not commonly accepted. E-SM (Extended Safety Margin) is derived from SM, i.e. an established concept in nuclear reactor safety ERT (Emergency Rescue Team) is a virtual entity: it shall be mandatory after Fukushima
Introduction of an additional safety barrier for nuclear power reactors
In the present paper a proposal is formulated to improve the safety of existing and future nuclear reactors. The idea is based upon the introduction of a new safety barrier against the release of radioactivity generated by the fission chain process. The proposal aims at fixing bases for possible strengthening of current Nuclear Reactor Safety by combining the logical frameworks associated with the concepts As-Low-As-Reasonably-Achievable (ALARA), Best-Estimate-Plus-Uncertainty (BEPU),Extended-Safety-Margin (E-SM), Independent-Assessment (IA) and Emergency-Rescue-Team (ERT). The expected impact of the new barrier upon selected nuclear accidents is outlined. The cost for the implementation of the additional barrier is expected to be affordable from a financial viewpoint and to contribute to restoring the public confidence towards nuclear technology
Conjugating ALARA, BEPU, Safety Margins and Independent Assessment in Nuclear Reactor Safety
ALARA (As-Low-As-Reasonably-Achievable) is an early principle in Nuclear Reactor Safety, NRS (Nuclear Reactor Safety): Designers and Operators must do their best to minimize doses to the humans. BEPU (Best Estimate Plus Uncertainty) is an approach in Accident Analysis, part of NRS: one may state that BEPU implies the best use of computational tools to determine the safety of nuclear installations. Then, ALARA may be seen at the origin of BEPU, or ALARA is at the origin of BEPU. Furthermore, BEPU (and BEPU elements like V & V, Scaling, procedures of code application and code coupling, etc.) can be extended to all analytical parts of the Final Safety Analysis Report (FSAR). This brings to BEPU-FSAR. Safety Margin (SM) is an established concept in NRS: a few dozen SM values must be calculated in current safety analyses and demonstrated to be acceptable. The SM concept can be extended to everything part of the design, the operation and the environment for a Nuclear Power Plant (NPP) Unit. Here the environment includes the personnel in charge of activities connected with the NPP. The Extended SM concept, E-SM, implies the formulation of some ten-thousands SM values, which shall correspond to a similar number of monitored variables. Reasons for E-SM are the examples in section 4.1. Independent Assessment (IA) is an early requirement in NRS: data ownership and system complexity prevented so far a comprehensive application of the requirement. IA analyses conflict with industry policies to keep proprietary data. IA based BEPU-FSAR analyses are essential to finalize the E-SM design.
In the paper we discuss that: a) ALARA is at the origin of BEPU; b) BEPU-FSAR analyses are the natural origin of E-SM values; c) The implementation of E-SM equals to introducing an additional physical barrier against the release of fission products
The need of adding a safety barrier to water cooled nuclear reactors
The present paper deals with the proposal of an additional safety barrier for the class of large (1000 MWe or more) Light Water Reactors (LWR) now in operation, in construction, or under design. Emphasis is given to the motivations or the needs for the barrier. Two main parts of the paper can be distinguished. The following topics are discussed in the former part: (a) the weakness of the barrier constituted by the current design of nuclear fuel; (b) the continuously increasing complexity of the system, with main reference to the Instrumentation and Control (I&C); (c) the role that the Large Break Loss of Coolant Accident (LBLOCA) had for arriving at the current layout of the Reactor Coolant System (RCS). Furthermore avoiding the severe accidents in 1979, 1987 and 2011, is at the basis of the proposal. In the latter part, the elements of the proposed technological safety barrier are discussed: the As-Low-As-Reasonably-Achievable (ALARA) principle, the Best Estimate Plus Uncertainty (BEPU) approach, the Extended Safety Margin Detection (E-SMD) hardware, the Emergency Rescue Team (ERT) strategy (or a virtual entity for the reactor) and the Independent Assessment (IA) concept. The additional safety barrier, although not demonstrated in the paper, is expected to reduce for a factor in the range 10-1000 the probability of core melt and to have a cost in the order of 1% the cost of a nuclear reactor unit
ADDING A SAFETY BARRIER FOR EXISTING AND NEW NUCLEAR POWER PLANTS
A proposal is formulated in the present paper to improve the safety of existing and future
nuclear reactors. The proposal is based upon the introduction of a new safety barrier against the
release of radioactivity generated by the fission chain process. Basically, two motivations for the
proposal arise: a) in the last two or three decades experimental evidence demonstrated that the
established barrier constituted by the fuel pin clad is weak and easily trespassed by fission products
during various phases of the fuel cycle, with main regard (here) to the in-core irradiation; b) the
probability of core melt must (and can) be substantially lowered by adopting outcomes from recent
researches with main reference to the reached capabilities of computational tools. Furthermore, the
correct interpretation of the words ‘feedback from lessons learned’ impose that the conditions
which led to the occurred severe accidents are understood to be not replicable in the future and,
according to the statement of Australian and Chinese scientists, “upgrading and strengthening a
nuclear regulatory system is not optional but imperative to prevent the next core meltdown”.
The proposal aims at fixing bases for possible strengthening of current Nuclear Reactor
Safety by combining the logical frameworks connected with the terms As-Low-As-Reasonably-
Achievable (ALARA), Best-Estimate-Plus-Uncertainty (BEPU), Extended-Safety-Margin (E-SM),
Independent-Assessment (IA) and Emergency-Rescue-Team (ERT). The cost for the
implementation of the additional barrier is expected to be affordable from a financial viewpoint and
to contribute to restoring the public confidence towards nuclear technology
NEW SAFETY BARRIER FOR CURRENT AND FUTURE NUCLEAR REACTORS
A proposal is formulated in the present paper to improve the safety of existing and future
nuclear reactors. The proposal is based upon the introduction of new safety barrier against the
release of radioactivity generated by the fission chain process.
Basically, two motivations for the proposal arise:
a) in the last two or three decades experimental evidence demonstrated that the established
barrier constituted by the fuel pin clad is weak and easily trespassed by fission products during
various phases of the fuel cycle, with main regard (here) to the in-core irradiation;
b) the probability of core melt must (and can) be substantially lowered by adopting
outcomes from recent researches with main reference to the reached capabilities of
computational tools.
Furthermore, the correct interpretation of the words ‘feedback from lessons learned’
impose that the conditions which led to the occurred severe accidents are understood to be not
replicable in the future and, according to the statement of Australian and Chinese scientists,
“upgrading and strengthening a nuclear regulatory system is not optional but imperative to
prevent the next core meltdown”.
The proposal aims at fixing bases for possible strengthening of current Nuclear Reactor
Safety by combining the logical frameworks connected with the terms As-Low-As-Reasonably-
Achievable (ALARA), Best-Estimate-Plus-Uncertainty (BEPU), Extended-Safety-Margin (ESM)
and Independent-Assessment (IA). The cost for the implementation of the proposal is
expected to be affordable from a financial viewpoint and to contribute to restoring the public
confidence towards nuclear technology
The technological challenge for current generation nuclear reactors
The present paper deals with the proposal of an additional safety barrier for the class of large (1000 MWe or more) Light Water Reactors (LWR) now in operation, in construction, or under design. Emphasis is given to the motivations or the needs for the barrier. Two main parts of the paper can be distinguished. The following topics are discussed in the former part (section 2): (a) the weakness of the barrier constituted by the current design of nuclear fuel; (b) the continuously increasing complexity of the system, with main reference to the Instrumentation and Control (I&C); (c) the role that the Large Break Loss of Coolant Accident (LBLOCA) had for arriving at the current layout of the Reactor Coolant System (RCS). Furthermore avoiding the severe accidents in 1979, 1987 and 2011, is at the basis of the proposal. In the latter part (sections 3 and 4), the elements of the proposed technological safety barrier are discussed: the As-Low-As-Reasonably-Achievable (ALARA) principle, the Best Estimate Plus Uncertainty (BEPU) approach, the Extended Safety Margin Detection (E-SMD) hardware, the Emergency Rescue Team (ERT) strategy (or a virtual entity for the reactor) and the Independent Assessment (IA) concept. The additional safety barrier, although not demonstrated in the paper, is expected to reduce for a factor in the range 10–1000 the probability of core melt and to have a cost in the order of 1% the cost of a nuclear reactor unit
BEPU and Safety Margins in Nuclear Reactor Safety
Abstract. Approaches like Best Estimate Plus Uncertainty (BEPU) and concepts like Safety Margins (SM) are
well established in Nuclear Reactor Safety (NRS). However continuous improvements in analytical techniques
and in the sophistication of hardware products do not necessarily correspond to new industrial applications
within Nuclear Power Plants (NPP) technology. The declining condition for nuclear technology also contributes
to the lag between developments and applications definitely causing NPP safety at a level below the achievable
level. The possibility to extend BEPU to all areas of the Final Safety Analysis Report (FSAR), so-called BEPUFSAR
is outlined in the paper. This should be combined with the Extension of the SM concept (E-SM). BEPUFSAR
techniques may be at the origin of E-SM which also will need specific monitoring hardware. All of this
may open new horizons for NRS and for acceptance of NPP by the public and the decisions makers. The paper
describes recent accomplishments in the areas of BEPU and E-SM
The External Costs of the Production of Electrical Energy and Their Inclusion in the Environmental Protection Policy
U radu su prikazane ekonomske osnove eksternih troškova i način njihove procjene. Opisana su dva osnovna načina za određivanje eksternih troškova: metoda slijeda utjecaja (ili metoda troškova štete) i metoda troškova kontrole. Pritom se definirao opseg analize, prioritetni utjecaji, pritisci na okoliš, prihvatna okolina, rasprostiranje polutanata u okolišu (procjena izloženosti), funkcijska veza izloženosti i učinaka, novčano vrednovanje i ocjena nesigurnosti
Zaključeno je da troškovi smanjenja emisija progresivno rastu sa stupnjem redukcije, iz čega slijedi da politika zaštite okoliša koja se temelji isključivo na propisivanju standarda nije idealno rješenje jer izaziva nepotrebno visoke troškove. Pokazalo se da bi relaksacija regulativnih prema tržišno orijentiranim mjerama mogla donijeti financijsku uštedu uz istu ekološku dobit.In this article, the economic foundations for external costs and the manner of evaluating them are presented. Two basic methods for determining external costs are described: the impact pathway method (or the costs of damages method) and the costs of control method.
The range of analysis, priority impacts, pressures on the environment, receiving environment, pollution distribution in the environment (assessment of exposure), the functional link between exposure and impact, monetary valuation and risk assessment are defined.
It is concluded that the costs of reducing emission progressively increase with the level of reduction. Therefore, an environmental protection policy based exclusively on stipulated standards is not an ideal solution because it generates unnecessarily high expenditures. It has been demonstrated that easing the regulations toward market-oriented measures could yield financial savings of equal ecological benefit