24 research outputs found
The Logistics Education In The Universities of Turkey
Logistics is one of the most important compenents in achieving the success for the firms in competition in the present day and that the employment of the qualified people who graduated from universities by firms in this field is crucial. For this reason, that the promising logistics managers take the sufficient education and training in the field of Logistics Management is one of the most important subjects. For a succesful education and training, the contents of the courses, the academic staff who teach and the methods used in teaching are quiet important. In this study used the questionnare method, it’s aimed to cover up the available case by making an extensive research for logistics education in Turkey.Logistics, Education, Turkey
Karadeniz Tipi Balıkçı Teknesinin İmalat Süre ve Süreçlerinin Benzetim Tekniği ile Modellenmesi
Bu çalışmada, Karadeniz tipi bir balıkçı teknesinin üretim süreci detaylı olarak incelenmiş ve SİMİO simülasyon tabanında bir modeli oluşturulmuştur. Oluşturulan bu model ile Karadeniz tipi balıkçı teknesinin üretim süresi belirlenmiştir. Sonra, tekne imalatında çalışma saatleri değiştirilmek suretiyle teknenin imalat süresi belirlenmiş ve bu şekilde çalışma saatlerinin tekne üretim süresine olan etkileri incelenmiştir. Sonuç olarak, çalışma süresindeki her artışın tekne üretim süresini etkilemediği gözlemlenmiş ve çalışma saatlerindeki düzenli artışların Karadeniz tipi teknenin üretim süresi üzerine etkileri sayısal olarak ortaya konulmuştur
The Logistics Education In The Universities of Turkey
Logistics is one of the most important compenents in achieving the success for the firms in competition in the present day and that the employment of the qualified people who graduated from universities by firms in this field is crucial. For this reason, that the promising logistics managers take the sufficient education and training in the field of Logistics Management is one of the most important subjects. For a succesful education and training, the contents of the courses, the academic staff who teach and the methods used in teaching are quiet important. In this study used the questionnare method, it’s aimed to cover up the available case by making an extensive research for logistics education in Turkey
The Logistics Education In The Universities of Turkey
Logistics is one of the most important compenents in achieving the success for the firms in competition in the present day and that the employment of the qualified people who graduated from universities by firms in this field is crucial. For this reason, that the promising logistics managers take the sufficient education and training in the field of Logistics Management is one of the most important subjects. For a succesful education and training, the contents of the courses, the academic staff who teach and the methods used in teaching are quiet important. In this study used the questionnare method, it’s aimed to cover up the available case by making an extensive research for logistics education in Turkey
The effect of the pre-outfit and pre-pipe assemblies on shipyard efficiency
Çoğu endüstriyel alanda olduğu gibi, gemi inşa sektöründe de süreç iyileştirme çalışmaları son derece önemlidir. Günümüzde, tersanelerin rekabet avantajını sağlayabilmeleri ve varlıklarını devam ettirebilmeleri için üretim süreçlerini gözden geçirerek, çıktıyı artırabilecek iyileştirmeleri sağlamaları ve bunun sonucunda daha kısa sürede ürün teslimini gerçekleştirmeleri gerekmektedir. Ürün çevrim süresinin veya diğer bir ifadeyle imalat temin süresinin kısaltılması, tersanelerin yıllık üretim kapasitelerinin ve buna bağlı olarak pazar payının artmasına neden olacaktır. Bunların gerçekleştirilebilmesi için, tersanelerin, mevcut üretim sistemlerini detaylı bir biçimde analiz etmeleri ve sistem üzerinde çeşitli iyileştirmeleri yapması gerekmektedir. Bu çalışmada, bir iyileştirme süreci modeli belirlenmiş ve ele alınan bir çift dip bloğunun teçhiz ve boru montaj işlemlerinin tamamının blok montaj istasyonunda değil kısmen daha önceki istasyonlarda yapılması durumunda sistemin çıktı miktarının nasıl değiştiği izlenmiştir. Öncelikle, bir iyileştirme süreci modeli ortaya konulmuştur. İyileştirme süreci modeli, sürekli iyileştirme (Kaizen), darboğaz teorisi (OPT) ve Arena simülasyon gibi süreçleri içermektedir. Model içerisindeki adımlar, sırasıyla takip edilmiş ve mevcut üretim sisteminde, tamamı blok montaj sahasında yapılan teçhiz ve boru montaj işlemlerinin ön istasyonlarda yapılmasının sistemin çıktısına olan etkisi incelenmiştir. Çalışmanın sonunda, teçhiz ve boru montaj işlemlerinin daha önceki istasyonlarda yapılmasıyla ve mevcut durum üzerinde bazı ufak değişikliklerin yapılmasıyla birlikte sistemin belirli bir sürede ürettiği blok sayısının yani çıktı miktarının arttığı görülmüştür. Dolayısıyla, ön teçhiz ve ön boru montaj işlemlerinin tersane üretim sisteminin performansını artırdığı teorik olarak gösterilmiştir. Anahtar Kelimeler: Sürekli iyileştirme, darboğaz ilkesi, Arena simülasyon, ön teçhizleme, ön boru montaj.In recent years, the competition is very hard in shipbuilding industry just like other industries. In this competitive environment, it is very important that the companies work efficiently. In shipbuilding industry, the production should be performed in effective way so that the shipyards keep their competitive power against their competitors. The most important and serious competitors are the far eastern shipyards. The shipyards located in the far eastern countries have a serious competitive power. A ship can be launched in shorter time by the far eastern shipyards and also the costs are lower. By doing that, they meet the customer demands and sell a lot of ships and extend their market share. To keep competitive power, a shipyard needs to produce more ships in a given time or, in other words, reduce cycle time. To be able to produce a ship in shorter time and increase the system throughput, the first step is to analyze the current production system in detail and identify the processes. After the whole processes are identified, the activities which take long time and the unnecessary activities should be found. For doing this, all the activities should be investigated. The activities taking long time should be shortened and the unnecessary activities should be removed. As the processes and activities in the shipyard production system are investigated, it can be seen that a lot of shipyards perform their outfit and pipe works in block assembly area after the completion of the steel works. In other words, firstly, the steel works is completed, secondly, the outfit works and finally the pipe works are performed. All this works are carried out one after the other. So it takes a long time and the cycle time of a block is quite long. The longer the cycle times of blocks are, the longer the whole ship cycle time is. If the cycle time of a ship is long, then number of ships produced annually is lower. This, also, reduce the shipyard annual income. A double bottom block, a part of a container ship of 1150 TEU, was presented here as a sample case study. The block considered here covers almost all the work stations joining its production. Consequently, all the steel work activities in double bottom block production were taken into the process and the field of the study was extended. In this study, it is aimed to determine the effect of pre-outfit and pre-pipe assemblies on the system throughput. So, the whole of the outfit and pipe works weren?t performed in block assembly area, instead, some assembly works of outfits and pipes were performed in previous work stations. In this way, the effects of the pre-outfit and pre-pipe assemblies were seen. During this study, an improvement process model was proposed and applied. This model includes the continuous improvement process (Kaizen), bottleneck theory (OPT: Optimized Production Techniques) and Arena simulation. The steps in this model were followed one by one. In the model, the current case analysis was examined in detail and the parallel and serial work activities were determined. Considering these parallel and serial activities, the completion times of all work stations were found. Then, the current case was modeled in Arena simulation program and the data such as number of blocks produced in a given period and the waiting time were calculated. By using this data, it was seen that how many blocks the current system could produce and what work station in bottleneck situation. As a result of the simulation study, the block assembly station was found as a bottleneck of the process. In the other step, considering the bottleneck theory, some improvement suggestions were identified on the bottleneck station. The suggestions were mainly based on pre-outfit and pre-pipe assemblies. Then the suggestions were applied on the current case and the new case was achieved. By modeling the new case in Arena simulation program, some data were taken from simulation and compared with the new case. In this comparison, in a same working period, it was seen that the new case could produce more blocks than that of the current case. In other words, in the new case, the cycle time of a block is shorter than the current one. As a result, by performing outfit and pipe assemblies in earlier work stations, a shipyard can increase its throughput considerably. Approximate increase of 33% in block quantity in a given period was achieved. This is an important improvement rate and it gives a great competitive advantage to a shipyard. Keywords: Continuous improvement (Kaizen), bottleneck theory, Arena simulation, pre-outfit assembly, pre-pipe assembly
ENERGY EFFICIENCY PROJECT DESIGN AND APPLICATION STUDY OF AN ENERGY-INTENSIVE FACILITY
Yapılan çalışmanın amacı; yüksek oranlarda enerji tüketimi olan bir tesiste
kalite ve performansı düşürmeden enerji tüketimini azaltmak için yeni projeler
tasarlamak ve uygulamaktır. Bu çalışma için seçilen pilot tesis Ankara Sheraton
Otel ve Konferans Merkezi'dir. Tesis halihazırda işletilmekte olduğundan hem
inşaat aşamasında hem de elektrik ve mekanik tesisatlarında belli başlı enerji
verimliliği çalışmaları yapılmıştır.
İşletme ve tesisat incelenerek, otelin mimari ve teknik özelliklerine uygun enerji
verimliliği projeleri tasarlanmıştır. Bu projeler: Trijenerasyon sistemi ile
elektrik üretmek ve sistemin atık ısısıyla kışın ısıtma, yazın soğutma yapmak,
güneş enerjisiyle kullanma sıcak suyu elde etmek için güneş kolektörü sistemi
kurmak, mevcut ısıtma kazanlarına ekonomizör takarak kazan dönüş suyunu
ısıtmak, otelin lobi klima santrali dönüş havası ile otoparkları iklimlendirmek,
restoran ve toplantı odaları klima santralleri dönüş havası ile mutfakları
iklimlendirmek, tesisattaki vanalara vana ceketleri ile ısı izolasyonu yapmak,
ısıtma kazanlarının dış yüzeylerine ısı izolasyonu yapmak, enerji verimli
ampuller kullanarak aydınlatma için kullanılan enerjiyi azaltmaktır.
Tasarlanan bu sistemlerin maliyet analizleri yapıldığında ekipman-cihaz bazlı
sistemlerin ilk yatırım maliyetlerinin yüksek değerlerde ama geri ödemesürelerinin kabul edilebilir düzeyde olduğu görülmüştür. Bazı projelerde ise
geri ödeme süreleri çok küçük değerlerdedir. Bunun sebebi, bu tasarımların
yüksek maliyetli cihaz-ekipman uygulamalarıyla değil daha basit ve maliyeti
düşük ama enerji tasarrufu büyük uygulamalarla yapılmasıdır. Her iki
seçenekte de enerji verimli sistemler oluşturulmuş aynı işi yapan eski
tasarımlara göre enerji tüketiminde azalma elde edilmiştir.The aim of this study is to design and apply new projects in a facility which has
high rates of energy consumption in order to reduce energy consumption
without reducing the quality and performance. Pilot plant selected for this study
is Ankara Sheraton Hotel and Convention Center. Since the facility is in
operation, major works about energy efficiency in the electrical and mechanical
installation were carried out in construction phase.
Facility and systems are examined and energy efficiency projects are designed
in accordance with the hotel\'s architecture and the technical specifications.
These projects are: To produce electricity with a trigeneration system and to
use the system\'s waste heat for heating in winter and cooling in summer, to set
up a solar collector system, for getting domestic hot water from solar energy, to
heat boiler return water by using an economizer installed to existing heating
boilers, to air condition the car parks by using the hotel lobby's return air, to
air condition the kitchen by using the restaurants and meeting rooms return air,
to insulate the heating-cooling system valves by using valve jackets, to insulate
the external surfaces of the heating boilers, to reduce the energy consumption
used for lighting by using energy efficient bulbs. When the cost analysis of the
designed system is calculated, we see that equipment-based devices have upperinitial investment costs, but the payback periods are at an acceptable level. In
some projects the payback period is at a very small value. This is because these
designs are more simple and cheaper applications, not high-cost devices but the
result is an important energy saving. In both options, energy-efficient systems
have been created and energy consumption reduction has been obtained,
compared to the old designs
Tersaneler için Bir Üretim Planlama ve Kontrol Metodoloji Önerisi
Müşteri odaklı ve siparişe özel çalışan tersanelerin yaşadıkları zorluklardan biri de üretimin planlanması ilerlemenin kontrol edilmesidir. Bu zorluk üretimin kendi dinamikleri çerçevesinde ilerlemesine ve denetim dışı yürümesine neden olmaktadır. Yüksek süreç içi stok seviyesi bu tarz gemi inşaatının içinden
çıkılmaz hale gelmesine sebep olan faktörlerden birisidir. Süreç içi stok seviyesinin yüksek olmasının bir diğer olumsuz tesiri de üretim ortamındaki problemleri gizlemesi ve dolayısıyla da çözümünü zorlaştırmasıdır. Bu çalışmada bahsedilen mantığa göre çalışan tersaneler için mevcut performans değerlerine göre güncellenen bir planlama usulü ve geminin çelik tekne kısmının üretimi esnasında süreç içi stok seviyesinin aşırı artmasını önlemeye yardımcı olacak bir üretim kontrol sistemi modeli
araştırması yapılmıştır. Ortaya konulacak olan modelin bu tip tersaneler için bir başlangıç uygulaması olabileceği düşünülmektedir