31 research outputs found

    Facility Layout Linked with Scheduling Problem by Genetic Algorithm and Tabu Search

    Get PDF
    In this paper, we propose a method to solve simultaneously facility layout problem and scheduling problem. About a initial random layout planning, the production scheduling and the transportation scheduling of AGV are obtained by using priority rules. From the obtained transportation scheduling, the critical transportation and the closeness rating are obtained. Facility layout is renewed by the combined procedure of genetic algorithm and tabu search in order to reduce the material handling cost. By using this renewed facility layout, the production scheduling and the transportation scheduling of AGV are also revised until no further improvement is possible

    Plant Layout Method Considering Material Handling Cost and Maintainability

    Get PDF
    This paper presents a method using simulated annealing(SA) and genetic algorithm(GA) to solve the plant layout problem in which the layout is evaluated by material handling cost and maintainability. In the former study about facility layout problem, it was either the minimization of the objeective function consisting of transport cost or the maximization of the objective function consisting of closeness rating. In this paper, both transport cost and maintainability were included in the objective function to be minimized. The plant layout problem, this paper proposes the heuristic procedures to obtain a suboptimal layout solution by combining SA with GA. From the simulation by computer, it concluded that the method which SA is combined with GA is more efficient than the method which utilizes SA and GA independently

    A Study of Facility Layout Method in Recycling Plant using AGV

    Get PDF
    Our country faces a serious problem of the environmental pollution by the production and the large quantity consumption of the industry product. The thoroughness of resources recycling has become necessary to solve these problems. As for the product design and the production control, how productivity should be improved has been discussed with extreme emphasis. But from now, as for the product design, both assemblability and disassemblability must be taken into consideration at the same time. And also in production management, it must be investigated how the products can be recycled in the low cost. Therfore, the facility layout method with two phases in recycling plant, which is composed of both the procedure for the layout of facility group and the procedure for the layout of intermal facility group by the optimal solution method and the suboptimal solution method by neural network is proposed in this paper

    Current Performance and On-Going Improvements of the 8.2 m Subaru Telescope

    Full text link
    An overview of the current status of the 8.2 m Subaru Telescope constructed and operated at Mauna Kea, Hawaii, by the National Astronomical Observatory of Japan is presented. The basic design concept and the verified performance of the telescope system are described. Also given are the status of the instrument package offered to the astronomical community, the status of operation, and some of the future plans. The status of the telescope reported in a number of SPIE papers as of the summer of 2002 are incorporated with some updates included as of 2004 February. However, readers are encouraged to check the most updated status of the telescope through the home page, http://subarutelescope.org/index.html, and/or the direct contact with the observatory staff.Comment: 18 pages (17 pages in published version), 29 figures (GIF format), This is the version before the galley proo

    Fundamental research on polymer material as artificial muscle

    No full text
    corecore