635 research outputs found
RMD (Resource Management in Diffserv) QoS-NSLP model
This draft describes a local QoS model, denoted as Resource Management in Diffserv (RMD) QoS model, for NSIS that extends the IETF Differentiated Services (Diffserv) architecture with a scalable admission control and resource reservation concept. The specification of this QoS model includes a description of its QoS parameter information, as well as how that information should be treated or interpreted in the network
LC-PCN: The Load Control PCN Solution
There is an increased interest of simple and scalable resource provisioning solution for Diffserv network. The Load Control PCN (LC-PCN) addresses the following issues:\ud
o Admission Control for real time data flows in stateless Diffserv Domains\ud
o Flow Termination: Termination of flows in case of exceptional events, such as severe congestion after re-routing.\ud
Admission control in a Diffserv stateless domain is a combination of:\ud
o Probing, whereby a probe packet is sent along the forwarding path in a network to determine whether a flow can be admitted based upon the current congestion state of the network\ud
o Admission Control based on data marking, whereby in congestion situations the data packets are marked to notify the PCN-egress-node that a congestion occurred on a particular PCN-ingress-node to PCN-egress-node path.\ud
\ud
The scheme provides the capability of controlling the traffic load in the network without requiring signaling or any per-flow processing in the PCN-interior-nodes. The complexity of Load Control is kept to a minimum to make implementation simple.\u
RMD-QOSM: The NSIS Quality-of-Service Model for Resource Management in Diffserv
This document describes a Next Steps in Signaling (NSIS) Quality-of- Service (QoS) Model for networks that use the Resource Management in Diffserv (RMD) concept. RMD is a technique for adding admission control and preemption function to Differentiated Services (Diffserv) networks. The RMD QoS Model allows devices external to the RMD network to signal reservation requests to Edge nodes in the RMD network. The RMD Ingress Edge nodes classify the incoming flows into traffic classes and signals resource requests for the corresponding traffic class along the data path to the Egress Edge nodes for each flow. Egress nodes reconstitute the original requests and continue forwarding them along the data path towards the final destination. In addition, RMD defines notification functions to indicate overload situations within the domain to the Edge nodes
Recommended from our members
Fiscal Year 2008
This report documents the deactivation, decontamination, decommissioning, and demolition (D4) of eighteen buildings in the 300 Area of the Hanford Site that were demolished in Fiscal Year 2008. The D4 of these facilties included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, utility disconnection, deactivation, decontamination, demolition of the structure, and stabilization or removal of the remaining slab and foundation, as appropriate
Recommended from our members
Fiscal Year 2007
This report documents the deactivation, decontamination, decommissioning, and demolition (D4) of twenty buildings in the 300 Area of the Hanford Site. The D4 of these facilties included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, utility disconnection, deactivation, decontamination, demolition of the structure, and stabilization or removal of the remaining slab and foundation, as appropriate
An assessment of lessons learned in the communication and dissemination of emerging scientific issues to environmental policymakers. Part 1: Comprehensive Report
The relationship between science and policy is often seen as difficult. Yet from climate change to food security, many of the biggest challenges facing the world today rely upon effective policy making, based upon the best science and evidence. We need to make sure that we have established the right level of communication and relationship between these two groups. This research project sets out to look at that communication process: to examine closely the communications involved in real-life science-to-policy case studies and to identify the lessons from the past that can help us deal with scientific issues that are emerging now and those that will emerge in the future
- …