2 research outputs found
Recommended from our members
Layered and segmented system organization (LASSO) for highly reliable inventory monitoring systems (IMS)
The Trilateral Initiative is preparing for International Atomic Energy Agency (LUiA) verification of excess fissile material released itom the defense programs of the United States and the Russian Federation. Following acceptance of the material using an Attribute Verification System, the IAEA will depend on an Inventory Monitoring System to maintain Continuity of Knowledge of the large inventory of thousands of items. Recovery fiom a total loss of Continuity of Knowledge in such a large storage facility would involve an extremely costly inventory re-verification This paper presents the framework for a Layered and Segmented System Organization that is the basis for a highly reliable IMS with protection-in-depth
Recommended from our members
General technical requirements (GTR) for inventory monitoring systems (IMS) for the trilateral initiative
Pursuant to the Trilateral Initiative, the three parties (The Russian Federation, the United States, and the International Atomic Energy Agency) have been engaged in discussions concerning the structure of reliable monitoring systems for storage facilities having large inventories. The intent of these monitoring systems is to provide the capability for the IAEA to maintain continuity of knowledge in a sufficiently reliable manner that should there be equipment failure, loss of continuity of knowledge would be restricted to a small population of the inventory, and thus reinventory of the stored items would be minimized These facility-specific monitoring systems, referred to as Inventory Monitoring Systems (IMS) are to provide the principal means for the M A to assure that the containers of fissile material remain accounted under the Verification Agreements which are to be concluded between the IAEA and the Russian Federation and the lAEA and the United States for the verification of weapon-origin and other fissile material specified by each State as released from its defense programs. A technical experts working group for inventory monitoring systems has been meeting since Feb- of 2000 to formulate General Technical Requirements (GTR) for Inventory Monitoring Systems for the Trilateral Initiative. Although provisional agreement has been reached by the three parties concerning the GTR, it is considered a living document that can be updated as warranted by the three parties. This paper provides a summary of the GTR as it currently exists