28 research outputs found
Π’Π΅Ρ Π½ΠΎΠ»ΠΎΠ³ΠΈΡΠ΅ΡΠΊΠΈΠ΅ ΡΠ΅ΡΠ΅Π½ΠΈΡ Π΄Π»Ρ ΡΡΡΠΎΠΈΡΠ΅Π»ΡΡΡΠ²Π° ΡΠ°Π·Π²Π΅Π΄ΠΎΡΠ½ΠΎΠΉ Π²Π΅ΡΡΠΈΠΊΠ°Π»ΡΠ½ΠΎΠΉ ΡΠΊΠ²Π°ΠΆΠΈΠ½Ρ Π³Π»ΡΠ±ΠΈΠ½ΠΎΠΉ 3030 ΠΌΠ΅ΡΡΠΎΠ² Π½Π° Π³Π°Π·ΠΎΠ²ΠΎΠΌ ΠΌΠ΅ΡΡΠΎΡΠΎΠΆΠ΄Π΅Π½ΠΈΠΈ (Π’ΡΠΌΠ΅Π½ΡΠΊΠ°Ρ ΠΎΠ±Π»Π°ΡΡΡ)
ΠΠ±ΡΠ΅ΠΊΡΠΎΠΌ ΠΠΠ ΡΠ»ΡΠΆΠΈΡ ΡΠ°Π·Π²Π΅Π΄ΠΎΡΠ½Π°Ρ Π²Π΅ΡΡΠΈΠΊΠ°Π»ΡΠ½Π°Ρ ΡΠΊΠ²Π°ΠΆΠΈΠ½Π° Π³Π»ΡΠ±ΠΈΠ½ΠΎΠΉ 3030 ΠΌΠ΅ΡΡΠΎΠ² Π½Π° Π³Π°Π·ΠΎΠ²ΠΎΠΌ ΠΌΠ΅ΡΡΠΎΡΠΎΠΆΠ΄Π΅Π½ΠΈΠΈ.
Π¦Π΅Π»ΡΡ Π΄Π°Π½Π½ΠΎΠΉ ΡΠ°Π±ΠΎΡΡ ΡΠ²Π»ΡΠ΅ΡΡΡ β ΡΠΏΡΠΎΠ΅ΠΊΡΠΈΡΠΎΠ²Π°ΡΡ ΡΠ΅Ρ
Π½ΠΎΠ»ΠΎΠ³ΠΈΡΠ΅ΡΠΊΠΎΠ΅ ΡΠ΅ΡΠ΅Π½ΠΈΡ Π΄Π»Ρ Π±ΡΡΠ΅Π½ΠΈΡ Π²Π΅ΡΡΠΈΠΊΠ°Π»ΡΠ½ΠΎΠΉ ΡΠ°Π·Π²Π΅Π΄ΠΎΡΠ½ΠΎΠΉ ΡΠΊΠ²Π°ΠΆΠΈΠ½Ρ Π³Π»ΡΠ±ΠΈΠ½ΠΎΠΉ 3030 ΠΌΠ΅ΡΡΠΎΠ² Π½Π° Π³Π°Π·ΠΎΠ²ΠΎΠΌ ΠΌΠ΅ΡΡΠΎΡΠΎΠΆΠ΄Π΅Π½ΠΈΠΈ.
ΠΠ»Ρ Π΄ΠΎΡΡΠΈΠΆΠ΅Π½ΠΈΡ ΠΏΠΎΡΡΠ°Π²Π»Π΅Π½Π½ΠΎΠΉ ΡΠ΅Π»ΠΈ Π±ΡΠ»ΠΈ ΠΏΠΎΡΡΠ°Π²Π»Π΅Π½Ρ ΡΠ»Π΅Π΄ΡΡΡΠΈΠ΅ Π·Π°Π΄Π°ΡΠΈ:
1.Π‘ΠΏΡΠΎΠ΅ΠΊΡΠΈΡΠΎΠ²Π°ΡΡ ΠΊΠΎΠ½ΡΡΡΡΠΊΡΠΈΡ ΡΠΊΠ²Π°ΠΆΠΈΠ½Ρ.
2.Π‘ΠΏΡΠΎΠ΅ΠΊΡΠΈΡΠΎΠ²Π°ΡΡ ΠΏΡΠΎΡΠ΅ΡΡΡ ΡΠ³Π»ΡΠ±Π»Π΅Π½ΠΈΡ ΡΠΊΠ²Π°ΠΆΠΈΠ½Ρ.
3.Π‘ΠΏΡΠΎΠ΅ΠΊΡΠΈΡΠΎΠ²Π°ΡΡ ΠΏΡΠΎΡΠ΅ΡΡΡ Π·Π°ΠΊΠ°Π½ΡΠΈΠ²Π°Π½ΠΈΡ ΡΠΊΠ²Π°ΠΆΠΈΠ½.The object of the WRC is an exploration vertical well with a depth of 30 meters in a gas field.
The purpose of this work is to design a technological solution for drilling a vertical exploration well with a depth of 3030 meters in a gas field.
To achieve this goal, the following tasks were set:
1. Design the well structure.
2. Design the well deepening processes.
3. Design well completion processes
Π Π°Π·ΡΠ°Π±ΠΎΡΠΊΠ° Π½ΠΎΠ²ΡΡ Π²ΠΈΠ΄ΠΎΠ² ΡΠΎΡΠ±ΡΠΈΠΎΠ½Π½ΡΡ ΠΌΠ°ΡΠ΅ΡΠΈΠ°Π»ΠΎΠ² Π½Π° ΠΌΠΈΠ½Π΅ΡΠ°Π»ΡΠ½ΠΎΠΉ ΠΎΡΠ½ΠΎΠ²Π΅ Π΄Π»Ρ ΠΈΠ·Π²Π»Π΅ΡΠ΅Π½ΠΈΡ ΡΡΠΆΠ΅Π»ΡΡ ΠΌΠ΅ΡΠ°Π»Π»ΠΎΠ² ΠΈΠ· Π²ΠΎΠ΄Π½ΡΡ ΡΡΠ΅Π΄
Π ΠΏΡΠΎΡΠ΅ΡΡΠ΅ ΠΈΡΡΠ»Π΅Π΄ΠΎΠ²Π°Π½ΠΈΡ ΠΏΡΠΎΠ²ΠΎΠ΄ΠΈΠ»ΠΎΡΡ ΠΈΠ·ΡΡΠ΅Π½ΠΈΠ΅ Π»ΠΈΡΠ΅ΡΠ°ΡΡΡΠ½ΡΡ
ΠΈΡΡΠΎΡΠ½ΠΈΠΊΠΎΠ².Π ΡΠ΅Π·ΡΠ»ΡΡΠ°ΡΠ΅ Π±ΡΠ» ΡΠ°Π·ΡΠ°Π±ΠΎΡΠ°Π½ Π½ΠΎΠ²ΡΠΉ ΡΠΎΡΠ±ΡΠΈΠΎΠ½Π½ΡΠΉ ΠΌΠ°ΡΠ΅ΡΠΈΠ°Π» Π½Π° ΠΌΠΈΠ½Π΅ΡΠ°Π»ΡΠ½ΠΎΠΉ ΠΎΡΠ½ΠΎΠ²Π΅ Π΄Π»Ρ ΠΈΠ·Π²Π»Π΅ΡΠ΅Π½ΠΈΡ ΡΠΈΠΎΠ½ΠΎΠ² ΠΊΠ°Π΄ΠΌΠΈΡ ΠΈ ΡΠ²ΠΈΠ½ΡΠ° ΠΈΠ· Π²ΠΎΠ΄Π½ΡΡ
ΡΠ°ΡΡΠ²ΠΎΡΠΎΠ².In the process of investigation the study of literary sources.In the result there was developed a new sorption material on a mineral basis for izvlecheniya thions of cadmium and lead from aqueous plaster