378 research outputs found

    Understanding bi-project management: Engineering complex industrial construction projects

    Get PDF
    Abstract Engineering large industrial construction projects is usually a complex task involving several co-operating actors. This paper investigates a specific type of such projects, labelled bi-project management. Bi-project management is characterised by two main actors, each of whom manage a part of the project: the owner of the installation (the client organisation) responsible for the engineering of the production process part, and an engineering office responsible for the construction related part. This paper describes and analyses what an engineering office can do to improve control of its part of the project, knowing that its part must be completed in advance; in addition, it is dependent on the client's part and must adapt to any changes the client may make. A framework for analysis and control has been developed, which distinguishes four areas. Two areas (key documents and basic interaction structure) are based on normal project control practices. The two remaining areas have been added to deal with the technological uncertainty and planning structure of the client organisation. The framework helps elucidate the specific nature of bi-project management. Effective bi-project management should not only apply normal project management practices, but also anticipate risks and postpone work to the last possible moment. A main topic for future research is to identify the underlying causes for uncertainty in these types of projects.

    Towards a developmental state? Provincial economic policy in South Africa

    Get PDF
    This paper explores the meaning of the developmental state for spatial economic policy in South Africa. Two main questions are addressed: do provincial governments have a role to play in promoting economic prosperity, and to what extent do current provincial policies possess the attributes of a developmental state? These attributes are defined as the ability to plan longer term, to focus key partners on a common agenda, and to mobilise state resources to build productive capabilities. The paper argues that the developmental state must harness the power of government at every level to ensure that each part of the country develops to its potential. However, current provincial capacity is uneven, and weakest where support is needed most. Many provinces seem to have partial strategies and lack the wherewithal for sustained implementation. Coordination across government appears to be poor. The paper concludes by suggesting ways provincial policies could be strengthened

    Treatment sequences and drug costs from diagnosis to death in multiple myeloma

    Get PDF
    Novel therapies for multiple myeloma (MM) have improved patient survival, but their high costs strain healthcare budgets. End-of-life phases of treatment are generally the most expensive, however, these high costs may be less justifiable in the context of a less pronounced clinical benefit. To manage drug expenses effectively, detailed information on end-of-life drug administration and costs are crucial. In this retrospective study, we analysed treatment sequences and drug costs from 96 MM patients in the Netherlands who died between January 2017 and July 2019. Patients received up to 16 lines of therapy (median overall survival: 56.5 months), with average lifetime costs of €209 871 (€3111/month; range: €3942–€776 185) for anti-MM drugs. About 85% of patients received anti-MM treatment in the last 3 months before death, incurring costs of €20 761 (range: €70–€50 122; 10% of total). Half of the patients received anti-MM treatment in the last 14 days, mainly fully oral regimens (66%). End-of-life treatment costs are substantial despite limited survival benefits. The use of expensive treatment options is expected to increase costs further. These data serve as a reference point for future cost studies, and further research is needed to identify factors predicting the efficacy and clinical benefit of continuing end-of-life therapy.</p

    Can an online clinical data management service help in improving data collection and data quality in a developing country setting?

    Get PDF
    Background: Data collection by Electronic Medical Record (EMR) systems have been proven to be helpful in data collection for scientific research and in improving healthcare. For a multi-centre trial in Indonesia and the Netherlands a web based system was selected to enable all participating centres to easily access data. This study assesses whether the introduction of a Clinical Trial Data Management service (CTDMS) composed of electronic Case Report Forms (eCRF) can result in effective data collection and treatment monitoring. Methods: Data items entered were checked for inconsistencies automatically when submitted online. The data were divided into primary and secondary data items. We analysed both the total number of errors and the change in error rate, for both Primary and Secondary items, over the first five month of the trial. Results: In the first five months 51 patients were entered. The Primary data error rate was 1.6%, whilst that for Secondary data was 2.7% against acceptable error rates for analysis of 1% and 2.5% respectively. Conclusion: The presented analysis shows that after five months since the introduction of the CTDMS the Primary and Secondary data error rates reflect acceptable levels of data quality. Furthermore, these error rates were decreasing over time. The digital nature of the CTDMS, as well as the online availability of that data, gives fast and easy insight in adherence to treatment protocols. As such, the CTDMS can serve as a tool to train and educate medical doctors and can improve treatment protocols.Maarten A Wildeman, Jeroen Zandbergen, Andrew Vincent, Camelia Herdini, Jaap M Middeldorp, Renske Fles, Otilia Dalesio, Emile van der Donk, I Bing Ta

    Quantifying measures to limit wind driven resuspension of sediments for improvement of the ecological quality in some shallow Dutch lakes

    Get PDF
    Although phosphorus loadings are considered the main pressure for most shallow lakes, wind-driven resuspension can cause additional problems for these aquatic ecosystems. We quantified the potential effectiveness of measures to reduce the contribution of resuspended sediments, resulting from wind action, to the overall light attenuation for three comparable shallow peat lakes with poor ecological status in the Netherlands: Loosdrecht, Nieuwkoop, and Reeuwijk (1.8–2.7 m depth, 1.6–2.5 km fetch). These measures are: 1. wave reducing barriers, 2. water level fluctuations, 3. capping of the sediment with sand, and 4. combinations of above. Critical shear stress of the sediments for resuspension (Vcrit), size distribution, and optical properties of the suspended material were quantified in the field (June 2009) and laboratory. Water quality monitoring data (2002–2009) showed that light attenuation by organic suspended matter in all lakes is high. Spatial modeling of the impact of these measures showed that in Lake Loosdrecht limiting wave action can have significant effects (reductions from 6% exceedance to 2% exceedance of Vcrit), whereas in Lake Nieuwkoop and Lake Reeuwijk this is less effective. The depth distribution and shape of Lake Nieuwkoop and Lake Reeuwijk limit the role of wind-driven resuspension in the total suspended matter concentration. Although the lakes are similar in general appearance (origin, size, and depth range) measures suitable to improve their ecological status differ. This calls for care when defining the programme of measures to improve the ecological status of a specific lake based on experience from other lakes.
    • …
    corecore