5 research outputs found
Recommended from our members
Studies of plant establishment limitations in wetlands of the Willamette Valley, Oregon
Geological-seismological evaluation of earthquake hazards at Surry Mountain damsite, New Hampshire /
"June 1984."Cover title.Bibliography: pages 45-47.Final report.Study authorized by U.S. Army Engineer Division, New England by appropriation orderMode of access: Internet
Buck Island Reach, Mississippi River : Hydraulic model investigation /
Sponsored by Defense Nuclear Agency, conducted by U.S. Army of Engineer Waterways Experiment Station"March 1985."Cover title.Final report.Prepared for and funded by U.S. Army Engineer District, Memphis.Mode of access: Internet
Shoreline erosion study, Pleasure Island, Texas /
"Prepared for U.S. Army Engineer District, Galveston, Galveston, Texas.""December 1983."Cover title.Includes bibliographical references (page 28).Final report.Funded by U.S. Army Engineer District, Galveston, Galveston, Texas.".Mode of access: Internet
Tsunami response of Barbers Point Harbor, Hawaii /
"Prepared for U.S. Army Engineer Division, Pacific Ocean.""October 1982."Cover title.Bibliography: pages 53-54.Final report.Mode of access: Internet