5 research outputs found

    Geological-seismological evaluation of earthquake hazards at Surry Mountain damsite, New Hampshire /

    No full text
    "June 1984."Cover title.Bibliography: pages 45-47.Final report.Study authorized by U.S. Army Engineer Division, New England by appropriation orderMode of access: Internet

    Buck Island Reach, Mississippi River : Hydraulic model investigation /

    No full text
    Sponsored by Defense Nuclear Agency, conducted by U.S. Army of Engineer Waterways Experiment Station"March 1985."Cover title.Final report.Prepared for and funded by U.S. Army Engineer District, Memphis.Mode of access: Internet

    Shoreline erosion study, Pleasure Island, Texas /

    No full text
    "Prepared for U.S. Army Engineer District, Galveston, Galveston, Texas.""December 1983."Cover title.Includes bibliographical references (page 28).Final report.Funded by U.S. Army Engineer District, Galveston, Galveston, Texas.".Mode of access: Internet
    corecore