35 research outputs found
Recommended from our members
SSC Safety Review Document
The safety strategy of the Superconducting Super Collider (SSC) Central Design Group (CDG) is to mitigate potential hazards to personnel, as far as possible, through appropriate measures in the design and engineering of the facility. The Safety Review Document identifies, on the basis of the Conceptual Design Report (CDR) and related studies, potential hazards inherent in the SSC project independent of its site. Mitigative measures in the design of facilities and in the structuring of laboratory operations are described for each of the hazards identified
Recommended from our members
Workshop on Radiological Aspects of SSC Operation
Integral to the design of an accelerator facility is the provision of adequate shielding to contain any radiation arising from operation of the facility. Complementary to the questions of environmental shielding are a number of radiation questions related to operation of the completed facility. One obvious need is the specification of systems for monitoring environmental emissions to ensure consistency between the design criteria and the actual levels during operation. Another question is the effect on the components of the machine of the radiation within the environmental shield. These questions were examined at the workshop. This report is a summary of the materials presented at the workshop
Design description of the external experimental areas at the Fermi National Accelerator Laboratory
Recommended from our members
Development of the conventional facilities of the Superconducting Super Collider. Revision 1
This report discusses an overview of the construction of facilities at the Superconducting Super Collider
Recommended from our members
Workshop on radiological aspects of SSC operations
Integral to the design of an accelerator facility is the provision of adequate shielding to contain any radiation arising from operation of the facility. Complementary to the questions of environmental shielding are a number of radiation questions related to operation of the completed facility. One obvious need is the specification of systems for monitoring environmental emissions to ensure consistency between the design criteria and the actual levels during operation. Another question is the effect on the components of the machine of the radiation within the environmental shield. These questions were examined at the workshop. This report is a summary of the materials presented at the workshop
Recommended from our members
Report of test beam subgroup
Tasks reported on include: exploration of issues of demand for test beams, and particularly for high energy; fleshing out the possibilities of the High Energy Booster beams; and seeking inexpensive ways of providing high energy facilities. (LEW