13,114 research outputs found

    Research study on materials processing in space experiment number M512

    Get PDF
    Conclusions of the team of specialists can be generalized as: (1) Brazing and welding of metal structures in an orbital near zero gravity condition are quite feasible. (2) Design of joints for fabrication in zero gravity will place less emphasis on the tolerances and proximity of the adjacent structures than on the quantity of liquid metal available. (3) Brazing of metallic joints has many advantages over electron beam welding for practical reasons: simplicity, launch weight, development costs, joint design tolerances, remotization, etc. (4) No evidence of different physical or mechanical properties of liquid metals in zero gravity was observed. However, many differences in liquid behavior were observed. Many of these effects have been called adhesion-cohesion phenomena

    Research study on materials processing in space experiment number M512

    Get PDF
    Adhesion of the melted metals to the adjacent solid metals, and cohesion of the liquid metal to itself appeared to be equally as strong in zero gravity as on earth. Similar cut edge bead periodicity in cut thin plate, and similar periodic chevron patterns in full penetration welds were seen. The most significant practical result is that the design of braze joints for near zero gravity can be very tolerant of dimensional gaps in the joint. This conclusion is based on a comparison of narrow, wide and variable gap widths. Brazing is very practical as a joining or repairing technique for metal structures at zero gravity. The operation of the hardware developed to locate successive small (0.6 cm) diameter cylinders in the focus of the battery powered EB unit, melt the various metal specimens and deploy some liquid metal drops to drift in space, was generally successful. However, the sphericity and surface roughness were far from those of ball bearings

    A project and competition to design and build a simple heat exchanger

    Get PDF
    To address a declining interest in process engineering, a project to design and build a compact heat exchanger was initiated in the second year of a four-year, multidisciplinary degree programme in biotechnology. The heat exchangers had a double-pipe configuration and employed plastic outer pipes and copper inner pipes of various diameters. Designs produced ranged from coiled inner pipes to various multi-pass arrangements and were assessed on the basis of heat transfer achieved per unit mean temperature difference per unit cost. The project, which also formed the basis of a competition, was very well received by students and gave them hands-on experience of engineering design and construction, as well as team work, problem solving, engineering drawing and the use of simple tools. Based on the success of this project, a similar problem based learning approach will be initiated in the third year of the same degree programme and will focus on bioethanol production

    Commissioning the LHCb VErtex LOcator (VELO)

    Get PDF
    The LHCb VErtex LOcator (VELO) is designed to reconstruct primary and secondary vertices in b-hadron decays. It is a silicon microstrip detector situated closest to the interaction region. It provides fast tracking information to the trigger system. The design of the detector and the commissioning of its various sub-components are described here

    Effect of patch resolution and raster cell size on selected landscape metrics applied at Lubrecht Experimental Forest

    Get PDF

    Space shuttle orbit maneuvering engine reusable thrust chamber program

    Get PDF
    Tests were conducted on the regenerative cooled thrust chamber of the space shuttle orbit maneuvering engine. The conditions for the tests and the durations obtained are presented. The tests demonstrated thrust chamber operation over the nominal ranges of chamber pressure mixture ratio. Variations in auxiliary film coolant flowrate were also demonstrated. High pressure tests were conducted to demonstrate the thrust chamber operation at conditions approaching the design chamber pressure for the derivative space tug application

    Henri Temianka correspondence, Gurs

    Get PDF
    https://digitalcommons.chapman.edu/tobin_gurs_et_al_correspondence/1010/thumbnail.jp
    corecore