9 research outputs found

    PENGARUH CANGKANG KELAPA SAWIT SEBAGAI AGREGAT KASAR PADA CAMPURAN ASPAL CONCRETE BINDER COURSE (AC-BC)

    Get PDF
    Penelitian ini bertujuan untuk mengetahui kerakteristik Marshall campuran(AC-BC) menggunakan limbah cangkang pada sawit sebagai subsitusi agregat kasar pada campuran aspal aspal beton lapis AUS (AC-BC) dengan membuat variasi cangkang kelapa sawit 25%,50%,75%. Dan menentukan kadar aspal optimum (KAO). Hasil penelitian menunjukkan bahwa kerakteristik campuran AC-BC menggunakan limbah cangkang kelapa sawit sebagai subsitusi agregat kasar yang memenuhi spesifikasi pada semua kadar aspal meliputi nilai density (kepadatan), voids in mineral agregat (VMA), stabilitas dan marshall quotient (MQ), Kadar aspal Optimum (KAO) Campuran AC-BC 5%. Hasil yang didapat dari Marshall Test percobaanb (1) 1.693,3 kg 2.007,77 kg 1.911,01 kg 2.080,34 kg 1.959,39 kg Percobaan (2) 1.765,87 kg 1.959,39 kg 2.007,77 kg 1.983,58 kg 1.886,82 kg Percobaan (3) 1.644,92 kg 1.693,3 kg 1.765,87 kg 1.572,35 kg 1.451,4 kg. Dan Flow Percobaan (1) 2 mm, 3 mm, 2 mm, 3mm, 3 mm. Percobaan (2) 2 mm, 3 mm, 3 mm, 2 mm, 2 mm. Percobaan (3) 2 mm, 2 mm, 2 mm, 2 mm, 2 mm. Berdasarkan pengujian marshall stabilitas dan flow pada campuran cangkang kelapa sawit yang masih memenuhi spesifikasi dan layak digunakan dalam perkerasan lentur.Kadar cangkang kelapa sawit sebagai subsitusi agregat kasar pada campuran aspal AC-BC yang paling optimal berada pada subsitusi penambahan cangkang kelapa sawit 25% dan 50%

    ANALISIS KINERJA PELAYANAN PELABUHAN PENYEBERANGAN LABUHAN BILIK ā€“ UJUNG TANJUNG SARANG ELANG

    Get PDF
    Aspek yang ditinjau untuk menentukan kinerja angkutan penyeberangan meliputi Headway, Load factor, frekuensi layanan, waktu tunggu, tingkat kesesuaian harapan dan kinerja, serta biaya operasional kendaraan angkutan penyeberangan. Hasil analisis kinerja menunjukkan bahwa untuk headway rata-rata 10,5 menit, load factor rata-rata 49,23%, frekuensi layanan rata-rata 6,44 kend/jam, sedangkan untuk tingkat operasional rata-rata 5,2 menit.Total hasil tingkat kesesuaian antara kinerja penumpang dan ekspektasi adalah 55,53%.Hasil analisis tarif, biaya operasional sebesar Rp. 278.360.400/tahun, jarak penumpang orang Rp. 6.469 ā‰ˆ Rp. 6.500, dan tarif roda dua sebesar Rp. 7.426 ā‰ˆ Rp. 7.500, berdasarkan hasil analisis dapat dikatakan pada beberapa indikator kinerja yang baik, dan untuk tarif penumpang perusahaan mengalami kerugian,Ā  dan untuk roda dua yang lebih besar dari hasil analisis, itu berarti merugikan penumpang

    ANALISA ESTIMASI BIAYA PADA PELAKSANAAN PROYEK PEMBANGUNAN BENDUNGAN LAU SIMEME PAKET II DENGAN MENGGUNAKAN ALAT-ALAT BERAT DI KAB. DELI SERDANG SUMATERA UTARA

    Get PDF
    Dalam mengevaluasi pekerjaan alat berat pada proyek pembangunan Jalan Relokasi Pada Proyek Bendungan Lau Simeme Paket II dibutuhkan ketepatan untuk memilih alat ā€“ alat berat yang mempengaruhi produktivitas suatu perkerjaan. Berdasarkan data yang telah dihitung diketahui kapasitas Excavator pada galian adalah 520 mĀ³/hari, jumlah volume pekerjaan pada galian tanah adalah sebesar 323,2 mĀ³, waktu yang diperlukan untuk pekerjaan galian tanah adalah 1 hari, biaya yang dibutuhkan dalam pelaksanaan pekerjaan galian tanah adalah Rp.9.180.000,-. Dan kapasitas Bulldozer pada pemadatan tanah adalah sebesar 1253,60 mĀ³/hari, jumlah volume pekerjaan pada galian tanah adalah sebesar 481,56 mĀ³, waktu yang diperlukan untuk pekerjaan pemadatan tanah adalah setengah hari, biaya yang dibutuhkan pelaksanaan pekerjaan galian tanah adalah Rp.9.580.000,-. Berdasarkan data yang telah dihitung diketahui kapasitas Excavator pada galian adalah 520 mĀ³/hari, jumlah volume pekerjaan pada galian tanah adalah sebesar 3716,8 mĀ³, waktu yang diperlukan untuk pekerjaan galian tanah adalah 7 hari, biaya yang dibutuhkan dalam pelaksanaan pekerjaan galian tanah adalah Rp.40.260.000,-. Dan kapasitas Bulldozer pada pemadatan tanah adalah 1253,60 mĀ³/hari, jumlah volume pekerjaan pada galian tanah adalah sebesar 5538,03 mĀ³, waktu yang diperlukan untuk pekerjaan pemadatan tanah adalah 4 hari, biaya yang dibutuhkan pelaksanaan pekerjaan galian tanah adalah Rp.26.320.000,-. Dari data di lapangan dengan data hasil perhitungan didapatkan perbedaan produktivitas dikarenakan kondisi alat berat yang kurang baik

    PENILAIAN WILAYAH KUMUH DESA BANDAR RAHMAT KECAMATAN TANJUNG TIRAM KABUPATEN BATU BARA

    Get PDF
    Masalah permukiman kumuh merupakan salah satu isu utama pembangunan pedesaan. Banyak hal yang menjadi penyebab terbentuknya permukiman kumuh di wilayah pesisir, selain rendahnya tingkat kesejahteraan masyarakat, pola sosial dan kebiasaan mereka tinggal di kawasan kumuh. membuat permukiman kumuh ada di wilayah pesisir. Sesuai UU No. 1 Tahun 2011 tentang Perumahan dan Permukiman, mengamanatkan pentingnya upaya peningkatan kualitas perumahan dan permukiman kumuh. Pemerintah menetapkan kebijakan, strategi, dan pola penanganan yang manusiawi, berbudaya, berkeadilan, dan ekonomis. Penetapan lokasi perumahan dan permukiman kumuh harus didahului dengan proses pendataan yang dilakukan oleh Pemerintah Daerah dengan melibatkan peran serta masyarakat. Kegiatan penilaian iniĀ  dilakukan di Desa Bandar Rahmat, Kecamatan Tanjung Tiram, Kabupaten Batu Bara. Melalui kegiatan identifikasi ini diharapkan diperoleh data dan informasi yang menggambarkan profil permukiman kumuh di Desa Bandar Rahmat. Hasil penilaian ini menempatkan Desa Bandar Rahmat, pada tingkat kekumuhan sedang dengan nilai total 4

    KEGIATAN IDENTIFIKASI PERUMAHAN DAN KAWASAN KUMUH DESA BANDAR RAHMAT KECAMATAN TANJUNG TIRAM KABUPATEN BATU BARA

    Get PDF
    Problem of slum settlements is one of the main issues of rural development.. Many things are the cause of the formation of slum settlements in coastal areas, in addition to the low level of community welfare, social patterns and their habits to live in slum areas make slum settlements exist in the coastal area. In accordance UU No.Ā  1 of 2011 concerning Housing and Settlement Areas, mandates the importance of efforts to improve the quality of slum housing and slum settlements. The Government shall establish policies, strategies, and patterns of handling that are humane, cultural, just, and economical. Determination of the location of housing and slums must be preceded by a data collection process carried out by the Regional Government by involving the participation of the community. The identification activity was carried out in a slum area in Bandar Rahmat Village, Tanjung Tiram District, Batu Bara Regency. Through this identification activity, it is hoped that data and information will be obtained that describe the profile of slum settlements in Bandar Rahmat Village. The results of the identification and calculation of slums in Bandar Rahmat Village, obtained a moderate level of slums with a total value of 46

    An economic analysis of midwifery training programmes in South Kalimantan, Indonesia.

    Get PDF
    In order to improve the knowledge and skills of midwives at health facilities and those based in villages in South Kalimantan, Indonesia, three in-service training programmes were carried out during 1995-98. A scheme used for both facility and village midwives included training at training centres, peer review and continuing education. One restricted to village midwives involved an internship programme in district hospitals. The incremental cost-effectiveness of these programmes was assessed from the standpoint of the health care provider. It was estimated that the first scheme could be expanded to increase the number of competent midwives based in facilities and villages in South Kalimantan by 1% at incremental costs of US764.6andUS 764.6 and US 1175.7 respectively, and that replication beyond South Kalimantan could increase the number of competent midwives based in facilities and villages by 1% at incremental costs of US1225.5andUS 1225.5 and US 1786.4 per midwife respectively. It was also estimated that the number of competent village midwives could be increased by 1% at an incremental cost of US898.1perinternifreplicatedelsewhere,andatacostofUS 898.1 per intern if replicated elsewhere, and at a cost of US 146.2 per intern for expanding the scheme in South Kalimantan. It was not clear whether the training programmes were more or less cost-effective than other safe motherhood interventions because the nature of the outcome measures hindered comparison

    PENENTUAN LOKASI TITIK BOR UNTUK MENDAPATKAN SUMBER AIR BERSIH DESA BANDAR RAHMAT KECAMATAN TANJUNG TIRAM KABUPATEN BATU BARA

    Get PDF
    Availability of safe access to drinking water is one aspect of the slums of Bandar Rahmat Village. To build a good clean water well, reference data or information is needed regarding the investigation of groundwater potential around Bandar Rahmat Village, Tanjung Tiram Batubara District. This activity conducts geoelectrical testing using the resistivity method to be able to determine the value of rock resistivity which will later be used as a determination of the depth of shallow aquifers and deep aquifers. With the data obtained at each sounding point and correlated with other sounding points so that an aquifer pattern will be formed in the area. This method is used to investigate the subsurface layer based on the level of rock resistivity with groundwater (aquifer) that occupies voids in the geological layer (soil). The vertical geoelectric survey (sounding) is intended to estimate the thickness of the layer containing groundwater. The results of this survey will recommend the right drill point that can be drilled to penetrate the estimated depth so that abundant groundwater will be obtained. The next step is to make a well at the drill point for the people of Bandar Rahmat Village to use for their daily needs

    An economic analysis of midwifery training programmes in South Kalimantan, Indonesia

    No full text
    In order to improve the knowledge and skills of midwives at health facilities and those based in villages in South Kalimantan, Indonesia, three in-service training programmes were carried out during 1995-98. A scheme used for both facility and village midwives included training at training centres, peer review and continuing education. One restricted to village midwives involved an internship programme in district hospitals. The incremental cost-effectiveness of these programmes was assessed from the standpoint of the health care provider. It was estimated that the first scheme could be expanded to increase the number of competent midwives based in facilities and villages in South Kalimantan by 1% at incremental costs of US764.6andUS 764.6 and US 1175.7 respectively, and that replication beyond South Kalimantan could increase the number of competent midwives based in facilities and villages by 1% at incremental costs of US1225.5andUS 1225.5 and US 1786.4 per midwife respectively. It was also estimated that the number of competent village midwives could be increased by 1% at an incremental cost of US898.1perinternifreplicatedelsewhere,andatacostofUS 898.1 per intern if replicated elsewhere, and at a cost of US 146.2 per intern for expanding the scheme in South Kalimantan. It was not clear whether the training programmes were more or less cost-effective than other safe motherhood interventions because the nature of the outcome measures hindered comparison
    corecore